Similar Projects
Removal and Replacement of Boiler, Oil Burner, Circulator Motor and Associated Piping and Insulation
Post-Bid
South Salem, NY 10590

Mechanical, Plumbing and Electrical Work for the Lower Wappinger Creek Community Boat House
Post-Bid
Wappingers Falls, NY 12590

Boiler Maintenance for Housing Contract
Results
Watervliet, NY

Lansing Central School District - Reconstruction to Senior High School
Results
Lansing, NY

BSA Bird Island Wastewater Treatment Plant Boiler Deaerator System Improvements
Post-Bid
Buffalo, NY 14202

Q--SPS RO Water System Service 528A7
Results
Syracuse, NY 13210

Gun Tube Heat Treat Furnace Replacement at the Watervliet Arsenal, NY
Post-Bid
$25,000,000 to $100,000,000 est. value
Watervliet, NY

Annual Boiler/Burner Cleaning and Maintenance
Results
Pearl River, NY 10965

Granular Activated Carbon and Carbon Filter System Gravel Replacement - Project 4
Post-Bid
Niagara Falls, NY 14304

Building 17 Power Plant Equipment Maintenance, Testing and Repair for Centrifugal Chillers at West Averill Harriman State Office Campus
Term Contract
Results
Albany, NY 12226

Walter Panas High School Boiler Reconstruction
Post-Bid
Cortlandt Manor, NY 10567

Preventive Maintenance Service for the Building Management System and Ancillary Equipment
Term Contract
Results
Orangeburg, NY 10962

Water Treatment Supply, Maintenance and Service on Mechanical Systems
Post-Bid
Poughkeepsie, NY 12601

Construction of A New Visitor Center and Parking Facility Improvements - Mechanical
Results
$245,055 to $331,545 est. value
Kerhonkson, NY 12446

Replace Boiler
Post-Bid
Batavia, NY 14020

Last Updated 11/12/2019 02:11 PM
Project Title

Z--528-18-S112 Install Mixing Valves in Building 1 of Buffalo VAMC. Remove the Old Rubber Angle Stops and Add Ceramic Angle Stops as Well as Associated Connections.

Physical Address View project details and contacts
City, State (County) Bullville, NY 14215   (Orange County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install Mixing Valves in Building 1 of Buffalo VAMC. Remove the Old Rubber Angle Stops and Add Ceramic Angle Stops as Well as Associated Connections. Building 1 on the Buffalo campus of the VA is requesting construction services to: - Add mixing valves; - Remove the old rubber angle stops and add ceramic angle stops; - Add all associated connections; - Work to be performed in building 1 on all floors. Refer to excel spread sheet for room numbers and work to be performed in each room.

Details

Division 11 - Equipment.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents