Similar Projects
Animal Services Center- HVAC Kennel Upgrade And Re-Roof
Post-Bid
Las Cruces, NM 88001

Building Materials - Roofing and Waterproofing, Materials, Equipment, Tools, Supplies and Related
Post-Bid
Albuquerque, NM 87109

Y--Emergency Roof Repair at Beclabito Day School
Results
Shiprock, NM 87420

Roof Replacements at FTI VOR, Las Vegas, NM; MAFA RCAG, Midland, TX; and LRD VOR, Laredo, TX
Results
$150,000 to $200,000 est. value
Las Vegas, NM - Laredo, Midland, TX

Replace Roof Membrane at San Felipe Elementary School
Post-Bid
San Felipe Pueblo, NM 87001

Construction of the Los Lunas Middle School 2019 Roof Improvements
Results
Los Lunas, NM 87031

Roofing Services
Term Contract
Post-Bid
Isleta Pueblo, NM 87022

Z--Roof Removal/Replacement and HVAC Removal
Results
NM

New Roofing System
Post-Bid
Angel Fire, NM

Z--Navajo Dam Roof Replacement
Results
$25,000 to $100,000 est. value
NM

On-Call Roofing Repairs
Post-Bid
$60,000 est. value
Farmington, NM 87402

Replace Roofing Phase II
Results
$89,300 to $130,980 est. value
Chama, NM 87520

Re-Roofing Santa Clara Pueblo Behavioral Health Modular Buildings
Post-Bid
Espanola, NM 87532

Replacement of 2 Shingled Roofs
Results
Less than $19,219 est. value
Las Cruces, NM 88001

APS Data Center Re-roof
Post-Bid
Alameda, NM 87125

Last Updated 10/07/2020 08:37 AM
Project Title

Quemado Office Roof Replacement

Physical Address View project details and contacts
City, State (County) NM   (Catron County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DEMOLITION: Work shall include removal of existing roofing. The Shop has an existing metal roofing and the Old Office has shingles. Care shall be taken to ensure no damage is done to surrounding penetrations or other items on the roof. DECKING: Upon completion of demolition, any required decking which is suitable for metal roof overlayment, shall be properly installed for new metal roof. NEW ROOF INSTALLATION: Upon completion of demolition and inspection / replacement of decking, contractor shall install a new brown metal roof as described in specifications. All roofing shall be secure and prevent water penetration. All roofing shall include provisions for penetrations. Included with new metal roof shall be a synthetic polypropylene underlayment as recommended by manufacturer. For shop roof, all existing skylights (12 total) shall be adequately decked over and covered with new roof. Any penetrations no longer needed shall also be covered with new roofing. Contractor shall replace all trim associated with roof such as the facia and soffits and it shall be brown in color, a minimum of 24 gauge.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Roofing and Siding Panels, Roof Accessories.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents