Similar Projects
Guest House on Garrett / 521 Bryan
New Construction, Infrastructure - 39,870 SF
Design
$3,283,000 CJ est. value
Dallas, TX 75201

Everest Stone Showroom and Warehouse
New Construction, Infrastructure - 7,000 SF
Design
$10,000,000 CJ est. value
Dallas, TX 75229

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Wraparound Services Center
New Construction, Infrastructure - 11,000 SF
Post-Bid
$460,000 CJ est. value
Dallas, TX 75252

Fuel City Travel Center / Wylie
New Construction, Infrastructure - 9,244 SF
Post-Bid
$4,400,000 CJ est. value
Wylie, TX 75098

Advanced Metering Infrastructure System
Results
Allen, TX

Excavation Improvements for Inspiration, Phase 4B
Results
TX

Popeyes / McKinney
New Construction, Infrastructure - 2,700 SF
Construction
$725,000 CJ est. value
McKinney, TX 75070

DMD Acura Plano
New Construction, Infrastructure - 60,090 SF
Construction
$15,250,000 CJ est. value
Plano, TX 75093

Starbucks - Renner & PGBT
New Construction, Infrastructure - 2,063 SF
Pending Verification
$735,140 CJ est. value
Plano, TX 75074

Lone Star Medical Center - Building Two
New Construction, Infrastructure - 15,430 SF
Pending Verification
$2,000,000 CJ est. value
Allen, TX 75013

Bonton Farms Wellness Center
New Construction, Infrastructure - 4,700 SF
Design
$5,500,000 CJ est. value
Dallas, TX 75215

Frisco ISD McKinney Educational Facility (Craig Ranch) - Bid Package 2
New Construction, Infrastructure - 139,000 SF
Post-Bid
$38,500,000 CJ est. value
McKinney, TX 75070

Water and Wastewater Main Replacements at Various Locations
Infrastructure
Results
$13,892,600 est. value
Dallas, TX

K Avenue Lofts
New Construction, Infrastructure
Construction
$88,434,704 CJ est. value
Plano, TX 75074

Last Updated 02/10/2023 06:48 AM
Project Title

Sable Hills Lift Station and Force Main Improvements

Physical Address View project details and contacts
City, State (County) Sachse, TX 75048   (Dallas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $820,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of 5/25/2022, no bids were received. Owner intends to re-evaluate the project and rebid this summer. All bids shall be accompanied by an acceptable bid bond or cashier's check in an amount of five percent (5%) of the total bid. The bid guaranty is required by the CITY as evidence of good faith and as a guarantee that if awarded the contract, the BIDDER shall execute the Contract and furnish the required bonds and evidence of insurance within ten (10) days after receipt of the awarded contract. The successful bidder must furnish a Performance Bond and Payment Bond, each in the amount of 100 percent (100%) of the contract price, from an approved Surety company holding a permit from the State of Texas to act as surety, and acceptable according to the latest list of companies holding Certificates of Authority from the Secretary of the Treasury of the United States, or another Surety acceptable to the City. Further information concerning this Bid may be obtained by email only from the City of Sachse Public Works Department: Jon Lara, Public Works Coordinator, jlara@ cityofsachse.com or the assigned City Project Manager. 50-2t-132li The project includes the following estimated quantities of work: Reconstruction of the Sable Hills Lift Station and Force Main Improvements 285 L.F. of 4-inch HDPE force main by pipe bursting existing 2-inch force main One 5-foot diameter concrete valve vault Two (2) 5-HP submersible wastewater pumps One 40 kW standby diesel generator with automatic transfer switch 97 L.F. of 8-foot-tall ornamental security fencing 298 S.Y. 6-inch-thick reinforced concrete driveway pavement o Engineer's Estimate - $774,000

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents