Similar Projects
Water Treatment Plant Diesel Pumps and Motors Replacement Project
Infrastructure
Bidding
$600,000 est. value
Panama City, FL 32404

Reed Canal Park Stormwater Pond Pump
Infrastructure
Bidding
South Daytona, FL 32119

SHIP Program Well and Septic Installation
Post-Bid
Macclenny, FL 32063

Wet Well Cleaning
Post-Bid
North Port, FL

Plumbing Repair Services
Term Contract
Results
Fort Walton Beach, FL

New Condenser Water Return Well No.2
Term Contract
Results
Tallahassee, FL 32307

Southwest Water Treatment Plant Production Well 3 Construction and Testing
Infrastructure
Bidding
FL

Sources Sought - GSA, Region 4, Tampa, Design-Build Closed Loop Side Stream Filtration System, Water Source ACS and Piping Replacement
Post-Bid
$250,000 to $500,000 est. value
Tampa, FL

DX38 Dynamometer Pump and Motor Replacement Coast Guard Engineering
Results
$45,000 est. value
Miami Beach, FL 33139

District Plumbing Services
Term Contract
Bidding
FL

Plumbing Contractor Services
Term Contract
Post-Bid
West Palm Beach, FL

Reuse Irrigation Transfer Pumps
Results
Palatka, FL 32177

Southwest Wellfield Project, Phase 1; West Polk Lower Floridan Aquifer Project Phase 1; Construction Manager At Risk, Polk Regional Water Cooperative
Infrastructure, Alteration
Bidding
$462,000,000 est. value
Winter Haven, FL

Pensacola Beach Quiet Water Bath House Plumbing Repairs
Post-Bid
FL

G-310/G-335 950 CFS Pump Overhaul Project
Results
$2,660,000 to $2,940,000 est. value
West Palm Beach, FL

Last Updated 03/25/2022 02:08 PM
Project Title

Infusion Pumps - HHMC Daytona Campus

Physical Address View project details and contacts
City, State (County) Daytona Beach, FL 32114   (Volusia County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Plumbing, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, All Bids Received, Selection Underway
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents