Similar Projects
Replace Building Automation System Controls & Fan Coil Units
Term Contract
Design
Mississippi State, MS 39762

Scott Hall - 2022 HVAC Renovations
Alteration
Bidding
Decatur, MS

Chickasaw County School District, ESSER II HVAC
Alteration
Bidding
$400,000 est. value
New Houlka, MS 38850

THS PAC Chiller
Post-Bid
Tupelo, MS 38804

HVAC Improvements
Post-Bid
Jackson, MS

HVAC Control System
Results
MS

2020 HVAC & Electrical Upgrades
Results
$1,500,000 est. value
Tupelo, MS

2021 HEERF III HVAC Updates for COVID Prevention (Part Two) Utica HVAC Improvements Phase 3
Alteration
Bidding
$500,000 est. value
Utica, MS 39175

HVAC Service Provider
Term Contract
Post-Bid
Ellisville, MS 39437

HVAC Maintenance at City of Brookhaven Owned Facilities
Results
Brookhaven, MS

HVAC Service Provider
Alteration
Bidding
Forest, MS

Chiller Replacement
Term Contract
Post-Bid
Ellisville, MS

Bureau of Building 321-268 Housing Units HVAC Mississippi State Penitentiary
Results
Tutwiler, MS 38963

JTVE 222303 Building 75 Replace and Repair doors
Alteration
Bidding
$100,000 to $250,000 est. value
Gulfport, MS 39507

2021 HVAC Controls Upgrade
Post-Bid
Oxford, MS 38655

Last Updated 06/09/2022 11:17 PM
Project Title

2021 HEERF III HVAC Updates for COVID Prevention (Touchless Doors) - Rankin Campus

Physical Address View project details and contacts
City, State (County) Pearl, MS 39208   (Rankin County)
Category(s) Single Trades
Sub-Category(s) HVAC, Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of demolition and replacement of various entry doors to each building on the Rankin Campus including the Greenfield Road Campus and replacement with touch less sliding or swinging door units and operators. Project also includes required electrical work, ceiling and drywall work as needed to get power to the automatic units. Project includes interior and exterior painting of adjacent hollow metal doors and frames at the entrances.

Details

Division 08 - Openings, Doors and Frames, Windows.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents