Similar Projects
Seal and Stripe Various Lots 2020
Post-Bid
Toledo, OH

Olander Park Whetstone Loop Trail
Post-Bid
Less than $86,940 est. value
Sylvania, OH 43560

City of Maumee 214 Illinois Avenue Facility
Results
Less than $452,717 est. value
Maumee, OH 43537

Navarre Park Shelter House Improvements
Results
Toledo, OH

TOCI ADA
Post-Bid
Less than $101,818 est. value
OH

Sidewalk Improvement Project
Results
Less than $93,300 est. value
Oregon, OH

Parking Lot Maintenance Crack Fill, Seal and Stripe 2021
Post-Bid
Toledo, OH

LUC Schneider Road ADA Ramps
Results
Toledo, OH

Dana Toledo Axle Plant Parking Lot Expansion Project
Infrastructure
Post-Bid
$510,000 est. value
Toledo, OH 43610

2020 Sidewalk Program Phase I
Results
Toledo, OH

2021 Parking Lot Reconstructions
Infrastructure
Post-Bid
$245,000 est. value
Toledo, OH

2020 Sidewalk Program Phase 2
Results
Toledo, OH

Cherry Street Bike Lane Imprcwements
Results
Toledo, OH

Promenade Park Riverwalk Repairs
Results
Toledo, OH 43604

2020 Sidewalk Program and Miscellaneous Concrete Work
Results
Less than $115,000 est. value
Oregon, OH

Last Updated 07/02/2021 04:57 PM
Project Title

Metro parks Toledo Swan Creek Connector Trail

Physical Address View project details and contacts
City, State (County) Maumee, Toledo, OH 43615   (Lucas County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,303,617
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The new 10 foot wide path will consist of approximately 2,100 feet of aggregate path, 5,600 feet of asphalt, 580 feet of box beam boardwalk plus overlook, 2 steel truss bridges over Swan Creek, piling foundations with concrete caps, and concrete abutments. General construction includes clearing and grubbing; erosion control; storm drainage; aggregate and asphalt pavement; segmental retaining wall; concrete abutments and pier caps; steel pilings; steel truss bridges with concrete deck; box beams with concrete topping; railings.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents