Similar Projects
Last Updated | 12/27/2023 03:36 PM |
Project Title | Capacity Additions (Major Widening) - Sr 101L |
Physical Address | View project details and contacts |
City, State (County) | Scottsdale, AZ 85257 (Maricopa County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected January 2024 |
Bids Due | View project details and contacts |
Estimated Value | $108,141,707 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction is expected to begin in January 2024. Tracs No 101 Ma 036 F012301c Project No 101-b(210)t Termini Pima Freeway (Sr101l) Location Princess Drive to Shea Boulevard The amount programmed for this contract is $160,000,000. The location and description of the proposed work are as follows: The proposed SR 101L project is located in Maricopa County within the city of Scottsdale from Princess Driver to Shea Blvd between Milepost 36.5 and Milepost 41.0. The work consists of widening the existing freeway to add general purpose lanes. The work includes removing existing pavement, asphalt friction course, roadway edge treatments, and walls required to construct new roadway widening. Roadway widening work includes excavation, embankment, concrete and asphaltic concrete paving, concrete bridge widening, retaining walls, sound walls, storm drain, catch basins, a reinforced concrete box culvert extension, landscaping, erosion control, pavement markings, signing, traffic signals, lighting, FMS, potable water, utility manhole and valve adjustments, and other related work. The time allowed for the completion of the work included in the Construction Phase of the contract will be 784 calendar days. The time allowed for the completion of the work included in the Landscape Establishment Phase of the contract will be 365 calendar days. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. AZDOT - Capacity Additions (Major Widening) - Sr 101L |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |