Similar Projects
Southwest Water Treatment Plant - U22SWT - City Of North Port
New Construction, Infrastructure
Conception
$21,000,000 CJ est. value
North Port, FL 34287

Hammocks Subdivision
New Construction, Infrastructure
Conception
$37,000,000 CJ est. value
Pensacola, FL 32526

Gas Worx - Phase 1
New Construction, Infrastructure - 20,000 SF
Design
$175,000,000 CJ est. value
Tampa, FL 33605

NW North River Drive Multifamily
Demolition, New Construction, Infrastructure - 6,800 SF
Design
$50,000,000 CJ est. value
Miami, FL 33136

RFP D/B - US Business 41
Infrastructure
Bidding
$40,000,000 CJ est. value
Thonotosassa, FL 33592

Quick Turn Around Rental Car Facility (Precast Bldgs and Overflow Lot) - BP 2
New Construction, Infrastructure
Bidding
$20,000,000 CJ est. value
Sarasota, FL 34243

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

Brentwood Phase 1 Improvements
Post-Bid
Haines City, FL

Shingle Creek Shoal Removal
Results
Kissimmee, FL 34741

Bluewater Bay MSBU Flood Mitigation Project
Results
FL

Sea Breeze Mobile Home and RV Park
New Construction, Build-Out - 25,974 SF
Construction
$1,000,000 est. value
Islamorada, FL 33036

Nextran Orlando
New Construction - 86,811 SF
Construction
$18,000,000 est. value
Orlando, FL 32809

Sumter Villas
New Construction
Pending Verification
Bushnell, FL

The Tropic
New Construction, Infrastructure - 2,200 SF
Pending Verification
$60,000,000 CJ est. value
Hollywood, FL 33020

South Tamiami Trail Self Storage Facility
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Sarasota, FL 34238

Last Updated 09/08/2022 12:08 PM
Project Title

Peace River Regional Reservoir Project

Physical Address View project details and contacts
City, State (County) Arcadia, FL 34266   (DeSoto County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected September 2027
Bids Due View project details and contacts
Estimated Value $200,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 17, 2021, an engineer has been awarded and the project is in the feasibility/siting stages. Preliminary design is expected to begin spring 2022. Construction is anticipated in 2027. The previous solicitation is listed below for reference. --- The Peace River Manasota Regional Water Supply Authority's Water Resiliency Assurance Plan (WRAP) is a continuing program of infrastructure improvements to support regional water supply resiliency and meet growing drinking water needs across a 4-county area by interconnecting major water supplies and developing additional alternative water supply (AWS) capacity. As part of the WRAP, the Authority will develop at least 15 million gallons per day of additional drinking water supply capacity at the Peace River Facility. This additional AWS capacity development will require increased river pumping capacity, increased water treatment capacity, and an additional off-stream raw water storage reservoir at the Peace River Facility in DeSoto County, Florida. The additional off-stream reservoir and the increased river diversion capacity comprise the 'Peace River Regional Reservoir (PR3 ) Project' (Project), which is the subject of this advertisement. The Authority is requesting 'Statement of Qualifications' (SOQ) from consultants interested in providing professional design and engineering services for the feasibility, siting, design, permitting, and construction management of the Project. This work will require multi-disciplinary expertise for services including: reservoir and intake siting and capacity studies, evaluation of mitigation options, geotechnical and subsurface investigations, operational planning, engineering design, permitting, bidding, and construction management services. An information packet containing details of the Project and the SOQ submittal requirements is available for download from the Authority's website (www.regionalwater.org). If encountering any difficulties obtaining the necessary documents, contact Rachel Kersten at RKersten@regionalwater.org, or by calling 941-316-1776. Questions regarding this Request for SOQ must be directed by e-mail to Terri Holcomb at tholcomb@regionalwater.org no later than 5:00 P.M. EST on November 25, 2019. The method of contractor selection has not been determined at this time. Milestone Expected Date of Completion (1) Advertise for Consultant SOQ 11/06/2019 (2) Final Date for Questions 11/25/2019 (3) SOQ Submittals Due to the Authority 12/06/2019 (4) PSEC Meeting to Shortlist 12/12/2019 (5) Notification of Shortlisted Firms 12/13/2019 (6) Interviews and PSEC (a) Meeting/Ranking 01/09/2020 (7) Consultant Selection (b) 01/31/2020 (Board Action) Work Estimated Complete Feasibility studies including siting and capacity of project components 2021 Testing, Design, Permitting, Property Identification & Mitigation 2025 Construction 2028 Filling 2030

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents