Similar Projects
University of Utah Orthopedic Center (UUOC) Central Sterile Cart Washer
Alteration
Bidding
$283,540 est. value
Salt Lake City, UT 84108

Ingersoll Rand Compressed Air System Purchase and Install
Post-Bid

SD 100 HVAC Inverter Replacement
Post-Bid
Salt Lake City, UT

Sorenson Multi-Cultural Center Phase 2, Pool Air Handler Replacement
Results
Less than $1,099,944 est. value
Salt Lake City, UT 84104

Eccles HVAC Fans and Tab
Results
Less than $225,000 est. value
Sandy, UT

Utah State History Museum New North Capitol Building DFCM Construction VBS
New Construction - 17,000 SF
Construction
$14,000,000 est. value
Salt Lake City, UT

Mister Car Wash
New Construction - 5,381 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Taylorsville, UT 84123

Electric Heat Pump Water Heater
Term Contract
Post-Bid
Salt Lake City, UT

Annual Contract for Large A/C and Chiller Repairs
Term Contract
Results
Salt Lake City, UT

Hydraulic Test Stand Chiller
Post-Bid
Salt Lake City, UT 84116

DFCM Construction Pre-Qualified Mechanical-SLCC/SCC Heating Plant Boiler Replacement
Results
$487,000 est. value
Salt Lake City, UT

J041--660 - (S4) Emergent Air Handler Repair Bldg 2 Ahu Repairs
Post-Bid
Salt Lake City, UT 84148

Chiller Replacement Jefferson Jr. High School
Results
Kearns, UT 84118

Replace Chillers
Term Contract
Post-Bid
Salt Lake City, UT 84116

Gourley Elementary School HVAC Upgrade
Results
Kearns, UT 84118

Reported 07/23/2022 12:00 AM
Project Title

CHL Storage Condenser Replacement

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84103   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Bids by Invitation.
Project Status Bidding, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $10,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

1:1 replacement of the cold storage condenser units in the Church History Library. Existing refrigerant lines will need to be purged and the refrigerant to be returned to the owner for disposal or reuse. Please include condensers 23 and 24 as the base bid, with the rest of the condensers being replaced as an alternate price. Due to funding allocations, only 23 and 24 can be replaced this year.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Structural Concrete, Precast Structural Concrete, Grouting, Cementitious Grouting, Concrete Cutting.
Division 04 - Masonry, Common Work Results for Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Windows, Door Hardware, Window Hardware, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Flagpoles.
Division 11 - Equipment, Mortuary Equipment.
Division 12 - Furnishings, Art, Casework, Furnishings and Accessories, Rugs and Mats, Furniture.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Sidewalks, Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Storm Drainage Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents