Similar Projects
2022 Old Hoover Elementary Demolition and City High Tennis Court Project
New Construction, Infrastructure
Bidding
$2,350,000 est. value
Iowa City, IA 52245

Wetherby Park Sidewalk And Entrance Project
Alteration
Bidding
$93,000 est. value
Iowa City, IA 52240

Weber Elementary Bus Loop Replacement Project
Infrastructure
Post-Bid
$180,000 est. value
Iowa City, IA 52246

Gilbert Court Sidewalk Infill
Results
Iowa City, IA

Trailhead Plaza at Creekside Cross and Flow Trails
Infrastructure
Results
Coralville, IA 52241

Public Housing Pavement Repair
Infrastructure
Results
$147,000 est. value
Iowa City, IA

Curb Ramp 2021
Infrastructure
Results
$165,000 est. value
Iowa City, IA

North Liberty Forevergreen Road Trail Improvements
Infrastructure
Results
North Liberty, IA

2021 Summer Sidewalk Repair
Infrastructure
Results
$100,000 est. value
Iowa City, IA

Coralville Town Center Repairs 2021
Infrastructure
Results
Coralville, IA

Orchard Street Reconstruction
Infrastructure
Results
$1,220,000 est. value
Iowa City, IA

Muscatine Avenue Pedestrian Crossing
New Construction, Infrastructure
Results
$88,000 est. value
Iowa City, IA

Dubuque Street Phase 1
Infrastructure
Results
North Liberty, IA

Cedar River Crossing and Sutliff Bridge-West Area Improvements
New Construction, Infrastructure
Results
Oxford, IA

3rd Street Reconstruction
Infrastructure
Results
Hills, IA 52235

Last Updated 05/03/2022 12:17 AM
Project Title

Phillips Hall - Repair ADA Ramp at Entrance 4

Physical Address View project details and contacts
City, State (County) Iowa City, IA 52245   (Johnson County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $39,390 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of repair of the ADA ramp at entrance 4. The exiting concrete landing will be removed and replaced. The ramp will remain. The existing guardrail will be removed and replaced, and a handrail will be added along the wall. Minor electric work will be done to the existing door opener actuator and card reader. Both door actuators will be replaced with new

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents