Similar Projects
Marina Inlet Culvert Replacement - Wisconsin Department of Natural Resources
Infrastructure
Design
$318,000 CJ est. value
Sherwood, WI 54169

2022 Irish Road / Geiser Way / T.I.D. 6 Construction
Infrastructure
Post-Bid
$1,375,000 est. value
Chilton, WI

Wedging and Sealing
Infrastructure
Post-Bid
$240,000 est. value
Potter, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Sequoia Drive Sewer, Water, and Grade and Gravel
Infrastructure
Results
Appleton, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

RFP Engineering- Chilton- Hilbert
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Hilbert, WI 54129

RFP Engineering- Chilton- Hilbert
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Hilbert, WI 54129

Hot Mix Asphalt on Various Roads
Infrastructure
Post-Bid
$300,000 est. value
New Holstein, WI

Main Street Reconstruction
Infrastructure
Results
Menasha, WI

Asphalt Bridge Approaches - Appleton, Sth 441
Infrastructure
Pending Verification
$7,000,000 CJ est. value
Hilbert, WI 54129

Wedging and Seal Coating
Infrastructure
Post-Bid
$200,000 est. value
WI

Epoxy Pavement Markings - STH/USH, Locations on STN Per Annual Plan
Infrastructure
Results

Brillion Apartments
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Brillion, WI 54110

Last Updated 04/29/2023 02:12 AM
Project Title

Kiel-New Holstein, CTH Aa-Jordan Avenue

Physical Address View project details and contacts
City, State (County) Chilton, WI 53014   (Calumet County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,153,739 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Milling, Base, Asphalt Pavement, Base Patching, Concrete Pavement, Culvert Pipe, Curb and Gutter, Sidewalk, Bridge Deck Repair and Overlay, Guardrail, Pavement Markings. Estimate Anticipated Funding $2,000,000 - $2,999,999 With each sealed proposal, the bidder must include a properly executed bid bond or a cashier's check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. Contractors should submit all questions concerning plans and/or proposals through Website. This process is documented and can be found at Website. WisDOT - 021- Kiel-New Holstein, CTH Aa-Jordan Avenue *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents