Similar Projects
Wastewater Treatment Facility Upgrade
Bidding
Fort Fairfield, ME

Aeration Train 2 Rehabilitation
Bidding
South Portland, ME

P-381 Multi-Mission Dry Dock #1, Portsmouth Naval Shipyard (PNSY), Kittery Maine
Post-Bid
$500,000,000 est. value
Kittery, ME

Wastewater Treatment Facility Contract Superintendent
Post-Bid
Belfast, ME

Sanitary Sewer Pump Station Improvement
Results
Brunswick, ME

Aeration Basin and Building Improvements
Results
Brewer, ME

Pump Station 2 & Passamaquoddy Road Sewer & Water System Improvements
New Construction, Demolition - 17,060 SF
Construction
Perry, ME 04667

Pump Station 5 - Wildwood
Renovation
Bidding
Augusta, ME 04330

Water Street Pump Station Upgrades Pump Procurement Project
Post-Bid
Ellsworth, ME 04605

Littlejohn Pump Station Improvements
Results
Less than $556,000 est. value
Cape Elizabeth, ME 04107

New Wastewater Treatment Plant Administration Building
New Construction
Results
Less than $1,100,000 est. value
Old Orchard Beach, ME

Replacement Pump Station
Renovation
Results
Old Town, ME 04468

2019 Dewatering Upgrade
Results
Augusta, ME 04330

Baxter Boulevard Pump Station Upgrades
Renovation
Results
Portland, ME 04103

WWTF Improvements SRF
Results
Less than $6,800,000 est. value
Kennebunk, ME

Last Updated 07/01/2020 10:31 AM
Project Title

Wastewater Treatment Facility and Pump Station Upgrades

Physical Address View project details and contacts
City, State (County) Lincoln, ME   (Penobscot County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of installing two new Owner-furnished RBC assemblies, constructing a new diesel emergency stand-by power generator, automatic transfer switch and miscellaneous electrical and HVAC upgrades at the Lincoln Sanitary District WWTF, constructing a new stormwater pump VFD and miscellaneous electrical and HVAC upgrades at the Creamery Court Pump Station and constructing a new portable diesel emergency stand-by generator, automatic transfer switch and miscellaneous electrical and HVAC upgrades at the Military Road Pump Station in the Town of Lincoln.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents