Similar Projects
Saylors West Road Reconstruction Phase 6
Post-Bid
Brownsboro, TX 75756

2018 Street Improvement Bond Old Tyler Road
Post-Bid
$187,000 est. value
Chandler, TX 75758

Southern Region Disaster Recovery Support BPA
Results

Grading,Acp Bs&Surf, Bs Rpr, Ocst,Mbgf,Signs,Pvmk
Results
Less than $1,763,398 est. value
TX

Long Cove Community at Cedar Creek Lake Road Expansion Project
Post-Bid
$750,000 to $1,500,000 est. value
Malakoff, TX 75148

Seal Coating of Existing Streets
Results
$239,125 est. value
Athens, TX

2021 Seal Coat
Post-Bid
Athens, TX

Lonestar Sewer and Pavement Rehabilitation
Results
$192,060 to $202,730 est. value
Trinidad, TX 75163

BU 175G- Hazard Elimination and Safety
Infrastructure
Post-Bid
$613,850 est. value
TX

2021 Asphalt Paving
Term Contract
Results
$46,000 est. value
Athens, TX

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

Rplc BR and APP,C and G,Ret Walls,ACP B and S
Results
Less than $26,767,054 est. value
TX

Brownsboro Elementary School New Driveway Improvements
Infrastructure
Post-Bid
$280,000 est. value
Brownsboro, TX 75756

2021 Group Seal Coat Program
Results

Street Improvements Project
Infrastructure
Results
$210,000 est. value
Berryville, TX

Reported 11/04/2021 12:00 AM
Project Title

Phase 3 of Welch Road Reconstruction Project

Physical Address View project details and contacts
City, State (County) Gun Barrel City, TX 75156   (Henderson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This phase will be from Scott Lane to Loving Lane 1,440 feet X 23 feet wide. Bid packages will include: Milling of up to 8” of existing pavement with removal and haul off of 2” to the street dept., 6” of cement stabilization, 2.5” of HMAC Type B, 1.5” of HMAC Type D, 4” double yellow thermoplastic painted centerline, 4” single white thermoplastic edge lines, and traffic control in place.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents