Similar Projects
RFP Design - Design and Construction of Mckee Run Control House
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Dover, DE 19904

Smyrna Farmers Market
Demolition, New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Smyrna, DE 19977

North Duck Creek Water Tower
New Construction, Infrastructure
Bidding
$3,500,000 CJ est. value
Smyrna, DE 19977

North Duck Creek Water Tower
New Construction, Infrastructure
Bidding
$3,500,000 CJ est. value
Smyrna, DE 19977

Calvary Baptist Church / Dover
New Construction, Infrastructure - 27,000 SF
Post-Bid
$9,000,000 CJ est. value
Dover, DE 19904

Laboratory Expansion - Bid Package 2: Steel, Carpentry, General Work
Addition, Demolition, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Smyrna, DE 19977

Water Meter
Term Contract
Results
Dover, DE

2020 Streets Utility Project
Infrastructure
Results
Milford, DE

TPE DE NE91 Oak Lane Farm Solar
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Smyrna, DE 19977

College Road Pump Station Upgrade/Replacement
Renovation, Infrastructure
Bidding
$3,000,000 CJ est. value
Dover, DE 19904

Heritage Elementary School Dehumidifier Installation
Post-Bid
Wilmington, DE 19808

Underground Utility Locating Services
Term Contract, Infrastructure
Results
Dover, DE

Smyrna High School - Athletic Field, Track, and Tennis Surface Renovations
Infrastructure
Bidding
$400,000 CJ est. value
Smyrna, DE 19977

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Milford 2020 Utilities and Street Rehab Project
Infrastructure
Results
Milford, DE 19963

Last Updated 09/06/2022 09:37 AM
Project Title

PS24A (Carter Rd) Main Transmission pump upgrades, piping and forcemain improvements - CS11 - Kent County

Physical Address View project details and contacts
City, State (County) Smyrna, DE 19977   (Kent County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $2,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is planned in preparation of the substantial residential growth proposed in the Southwest area of Smyrna and Clayton. The resulting flow increase is projected to exceed the capacity of the existing pumps and forcemain. This project includes replacing the existing submersible pumps with higher capacity pumps, associated electrical and generator upgrades and replacement of 3,000 feet of existing 12" SDR 21 PVC forcemain with 14" pipe. The funding sources are State of Delaware Revolving Fund Loan and Main Systems Capital Improvement Fees. This project is in included in the Kent County FY 2023 Approved Budget.As of September 6, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents