Similar Projects
Thermoplastic Pipe 2022
Term Contract
Bidding
MO

Reinforced Concrete Pipe 2022
Term Contract
Bidding
MO

Forest Park Waterway
Post-Bid
$7,102,880 est. value
Saint Louis, MO 63110

Harrison County Courthouse Landscape and Drainage Improvements
Post-Bid
MO

Elson Street Culvert Replacement
Results
Kirksville, MO

Deer Creek Flood Mitigation Phase 2
Results
Brentwood, MO

Corrugated Metal Pipe
Infrastructure
Bidding
Josephville, Saint Charles, Saint Peters, Wentzville, MO 63385

Harrison County Courthouse Landscape and Drainage Improvements
Post-Bid
Bethany, MO 64424

West Hangar Drainage Improvements
Results
Chesterfield, MO 63005

North Cool Springs Precast Box
Infrastructure
Bidding
O Fallon, MO

Clean and Shape Ditches
Alteration
Post-Bid
Martinsburg, MO

Paddock Creek Improved Channel Repair
Results
$597,000 est. value
Chesterfield, MO

Elementary Library Drainage
Infrastructure
Post-Bid
Iberia, MO

Metal Pipe (CMP and Arch Pipe)
Results
MO

Sidewalk and Drainage Improvements
Infrastructure
Post-Bid
Saint Charles, MO

Last Updated 01/25/2022 06:43 AM
Project Title

Corrugated Metal Pipe - Central Area - Southwest District - Large Diameter

Physical Address View project details and contacts
City, State (County) Springfield, MO   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents