Similar Projects
Access Road - Phase 2
Infrastructure
Bidding
$600,000 est. value
Ridgeville, SC

Blatt Building - Replace Domestic Water Lines
Infrastructure
Bidding
$1,500,000 to $2,000,000 est. value
Columbia, SC

Coward Water Imporvements-2019
Post-Bid
Coward, SC

Advanced Metering Infrastructure System
Post-Bid
West Columbia, SC

88 Connector Transmission Main
Results
Easley, SC 29642

Mahaffey Road Wastewater Line Replacement Project
Results
Williamston, SC 29697

Water Quality Monitoring System
Infrastructure
Bidding
Rock Hill, SC

5 Mueller Super Centurion 250 Fire Hydrants
Post-Bid
York, SC

Water Box and Lid for W and S Department - Annual Pricing
Term Contract
Results
Summerville, SC 29483

Edge Water
Infrastructure
Bidding
$300,000 to $400,000 est. value
Greenville, SC

South Magnolia Street Waterline Replacement
Post-Bid
Sumter, SC 29150

I-20 Mineral Springs Force Main Relocate
Results
$50,000 est. value
Lexington, SC 29071

Reading Street - Water Distribution Materials
Infrastructure
Bidding
York, SC 29745

Palmetto Commerce Parkway Interchange Improvements Water Main Relocation
Post-Bid
Ladson, SC 29456

Water Main Construction along Normandy Road, Castle Road, Hillmark Drive and Sedgewick Road (WM3081) - MPP Project
Results
Columbia, SC 29210

Reported 06/10/2022 12:00 AM
Project Title

Fy22 - Lake Marion Providence Reach-Water Line

Physical Address View project details and contacts
City, State (County) Charleston, SC   (Berkeley County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing, installing, and placing into successful operation approximately 6,280 LF of 12-inch and 14-inch diameter water main pipe, master meter station, and all associated work. The contract includes all pipe, valves, appurtenances, roadway bores, horizontally directionally drilled pipe, backfill, compaction, testing, quality control, safety, and all other related work required to place the project into successful operation. This contract will be a portion of the Lake Marion Regional Water System with portions owned, operated, and maintained by both Santee Cooper and Orangeburg County. The Contractor will be responsible for coordinating work with local utility owners, property owners, Lake Marion Water Treatment Plant personnel, and Orangeburg County.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents