Similar Projects
Shoreline Stabilization on Kay Road and Bay Boulevard Copiague
Infrastructure
Bidding
Copiague, NY 11701

Shore Road Waterfront Park Natural Systems Resiliency Improvements
Post-Bid
Lindenhurst, NY 11757

Corrugated Polyethylene Drainage Pipe
Infrastructure
Post-Bid
Brookhaven, NY

Governor`s Office of Storm Recovery Mastic Beach Drainage Improvements CR12 General Construction
Results
$2,025,000 to $2,406,000 est. value
Farmingville, NY 11738

Cured-In-Place Pipelining - Term Construction Contract 7
Results

Annual Drainage Contract A, B and C
Term Contract
Post-Bid
East Hampton, NY

Drainage Improvements Albany Avenue Resurfacing
Infrastructure
Results
Lindenhurst, NY 11757

Cast Iron Drainage Items
Term Contract, Infrastructure
Post-Bid
Smithtown, NY

Lakeside Drive Roadway and Slope Stabilization
Infrastructure
Results
Huntington, NY 11721

Precast Storm Drainage Structures and Reinforced Concrete Pipe
Term Contract
Post-Bid
Huntington, NY

2.0 Million Gallon Reservoir
Infrastructure
Results
East Hampton, Sag Harbor, NY 11963

East Beach Bluff Stabilization
Infrastructure
Post-Bid
Port Jefferson, NY 11777

West Neck Farm Seawall Restoration
Infrastructure
Results
NY

Fire Island to Montauk POint (FIMP) - Sandy Program
Term Contract
Post-Bid
Fire Island, Montauk, NY 11954

Forge Road Culvert and Fish Passage
Infrastructure
Results
Brookhaven, NY

Last Updated 12/28/2021 11:32 AM
Project Title

Stable Area Drainage Improvements

Physical Address View project details and contacts
City, State (County) Huntington, Lloyd Harbor, NY 11743   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $99,450 to $134,550
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work shall consist of improving site grading and drainage of the area immediately adjacent to the entrances of two of the horse barns. The completion date for this project is 90 days after agreement has been approved by the NYS Comptroller's Office.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents