Similar Projects
Water Reclamation Chemical Phosphorus Removal Systems - 22A03 - North Shore Water Reclamation District
Infrastructure
Conception
$3,663,000 est. value
Gurnee, IL 60031

Water Plant Pipe Support And Electrical Conduit Replacement - Village Of Northbrook
Renovation
Conception
$550,000 est. value
Northbrook, IL 60062

Wastewater Treatment Plant Replacement
New Construction
Design
Sterling, IL

Crest Hill Sewage Treatment Plant
Renovation
Design
$200,000 est. value
Crest Hill, IL

Rehabilitation of the 2,000,000 Gallon Legged High Tank
Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Downers Grove, IL 60515

RFP D/B - Southwest Plant Solar Power Purchase Agreement
Renovation
Bidding
$100,000 CJ est. value
Champaign, IL 61822

Replacement of Tank Mixer at Manchester Water Tower
Infrastructure
Sub-Bidding
$27,649 CJ est. value
Wheaton, IL 60187

FY23 UCSD Roof Replacement Project - Station U, Northeast Treatment Plant (NEP)
Renovation - 1,800 SF
Sub-Bidding
$400,000 CJ est. value
Urbana, IL 61801

Power Washing of the Fairfield Way Ewst (2.0 mg)
Post-Bid
Montgomery, IL

Sewage Treatment Plant
Post-Bid
Hudson, IL 61748

2018 WWTP Improvements
Results
Less than $4,710,000 est. value
Belvidere, IL 61008

New Ground Water Storage Tank
New Construction, Demolition
Results
Loda, IL 60948

Sawyer Water Purification Plant (SWPP) - Boiler Improvements - 38435 - City of Chicago
Renovation
Conception
$11,963,926 CJ est. value
Chicago, IL 60649

A/B and C/D Service Tunnel Rehabilitation - Phase Three
Infrastructure
Design
$23,135,000 CJ est. value
Stickney, IL 60402

Roof Replacement of the Lue-Hing M&R Complex Stickney Water Reclamation Plant
Renovation
Bidding
$8,376,000 CJ est. value
Cicero, IL 60804

Last Updated 08/16/2022 08:01 PM
Project Title

Water Treatment Plant - Brine Tank Rehabilitation (Contract C)

Physical Address View project details and contacts
City, State (County) Riverton, IL 62561   (Sangamon County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $735,000 [brand] Estimate
Plans Available from Structural Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: This project is for the brine tank rehabilitation at the Water Treatment Plant located at 7th Street and Route 36 in Riverton, Illinois. The portion of work in this advertisement for bids is the demolition of the concrete top slab and furnishing / installing new concrete top slab with new access hatches. Bids are requested for the following Contract: Contract C - Water Treatment Plant, Brine Tank Rehabilitation (631-012/21007.04) The Project has an expected duration of 30 days. Prospective Bidders may obtain or examine the Bidding Documents at the Issuing Office on Monday through Friday between the hours of 8 a.m. to 4 p.m., and may obtain copies of the Bidding Documents from the Issuing Office as described below. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office. There will be no pre-bid conference for the Project. All Contracts for the construction of public works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-2). Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, langes, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. The De Minimis, minor components, pig iron and direct reduced iron waiver apply to this contract. Bid security shall be furnished in accordance with the Instructions to Bidders. The award of Contracts on this project shall be predicated upon competitive bidding, with award being made to the lowest responsive, responsible bidder. Said lowest Bidder(s) shall be determined for each Contract by summarizing the applicable low base bid(s). The owner reserves the right to waive any informalities or to reject any or all bids. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. Owner: Village of Riverton

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents