Similar Projects
SR 20/Eagle Vista Dr to Ault Field Rd Vic - ADA Compliance
Infrastructure
Design
$668,000 CJ est. value
Oak Harbor, WA 98277

SR 20/Boon Rd Vic to Eagle Vista Dr Vic - Paving
Infrastructure
Design
$1,241,000 CJ est. value
Coupeville, WA 98239

EA-18G Aircraft FRS Training Facility
New Construction, Infrastructure - 27,160 SF
Bidding
$5,000,000 CJ est. value
Oak Harbor, WA 98278

Ault Field Road/Goldie Road Traffic Signal Improvements
Infrastructure
Bidding
$1,181,487 CJ est. value
Oak Harbor, WA 98277

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Hoypus Point Restoration
Infrastructure
Post-Bid
$200,000 to $240,000 est. value
Oak Harbor, WA

2022 to 2023 Unit Price Directional Boring Contract
Term Contract
Results
$2,000,000 est. value
Camano Island, WA

Thorndyke Road MP 4.71 Culvert Replacement
Infrastructure
Results
$1,656,400 est. value

SR 20 / W Fakkema Road - Intersection Improvements
Infrastructure
Design
$804,000 CJ est. value
Ault Field, WA 98277

Building & Courthouse Ault Field Road/goldie Road Traffic Signal Improvements
Infrastructure
Bidding
$1,181,487 CJ est. value
Coupeville, WA 98239

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

Deer Lake Access Redevelopment - Rebid
Infrastructure
Results
$91,766 CJ est. value
Clinton, WA 98236

East Cranberry Lake Dock Replacement at Deception Pass State Park
Infrastructure
Post-Bid
$850,000 CJ est. value
Oak Harbor, WA 98277

Deer Lake Access Redevelopment & Lake Cavanaugh Asphalt Paving, Pile Driving & Float Installation
Infrastructure
Results
$247,955 CJ est. value
Clinton, WA 98236

Flintstone Park Restroom Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$100,000 CJ est. value
Oak Harbor, WA 98277

Last Updated 05/11/2023 06:30 PM
Project Title

RFQ Engineering - Robinson Road Fish Passage Culvert Replacement

Physical Address View project details and contacts
City, State (County) Freeland, WA 98249   (Island County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Storm/Sewers
Contracting Method Competitive Bids
Project Status Conceptual Design, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 11, 2023, information regarding an award for this solicitation is not available. At this time, it is not known if an award has been made. Closed solicitation has been included below for reference. ……………….. Island County Public Works (AGENCY) solicits interest from consulting firms (CONSULTANT) with expertise in hydraulic design, fish passage, beach geomorphology, saltwater inundation, wetland evaluation, enhancement, mitigation and culvert design. Consultants will be considered for the following project. The work to be performed by the CONSULTANT consists of the design and construction support of a fish passable culvert located at Robinson Road, situated on Mutiny Bay in Island County, Washington (47.99332 N, 122.54118 W). The general scope of work includes preliminary site characterization, including evaluating existing hydraulic conditions upstream and downstream of the wetland adjacent to Robinson Road and Mutiny Bay, collection and analysis of hydraulic data, collection and analysis of geotechnical data, completion of a topographic survey, environmental permitting and monitoring, and the design of a fish passable replacement culvert. The site is within a FEMA coastal flood zone. The existing drainage system is under low pressure during high tides. The site has shoreline elevations that are higher than developed landward elevations. Tasks may include but are not limited to the following: o Fish passage design for the replacement of the Island County culvert that currently passes storm water from the Robinson Road area to Mutiny Bay. o Preparation of a Hydraulic Report using appropriate methods of analysis: o Existing hydraulic conditions o Reference reach information o Site Characteristics (bank full width, watershed conditions, geology & soils, etc.) o Fluvial geomorphology (channel geometry, erosion potential, flood flow, etc.) o Basin and watershed modeling o Analysis of floodplain impacts o Preparation of a Geotechnical Engineering Report: o Subsurface soils investigation o Engineering recommendations o Provide geotechnical field inspection during construction o Preparation of a Full Topographic Survey and Existing Conditions for Plan Development: o Right-of-way (ROW) survey, existing and proposed o Legal Descriptions and sketches for Permanent/Temporary Easements o All environmental work and reporting necessary to meet permitting requirements set by Island County Planning, WDFW, WDOE, and the US Army Corps of Engineers, including assessment, mitigation, monitoring, and fish exclusion. o Development of full plan sets, stamped by an Engineer, meeting the requirements of Island County, Local Agency Guidelines (LAG) manual, and applicable state and federal regulations: o Proposed fish passable culverts o Proposed roadway design within bounds of project area o Traffic control plan during construction to allow for homeowner access and other through traffic. o Development of project specific special provisions in the format of WSDOT's standard specifications.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents