Similar Projects
Karst Farm Trail
Bidding
Bloomington, IN

Studebaker Park Asphalt Path
Bidding
Elkhart, IN 46516

Joint Sealing System
Post-Bid
Indianapolis, IN 46077

Tincher Road Resurfacing
Post-Bid
Mooresville, IN 46158

Community Crossing Street Resurface Program
Results
Lake Station, IN 46405

IDIQ, Patch and Rehab Pavement
Results

Hardscape Improvements
Bidding
Lebanon, IN 46052

Smokey Row Road HMA Surface with Full Depth Patching
Post-Bid
IN

Deep River Rock Riffle Improvements
Renovation
Results
Lake Station, IN 46405

Asphalt Resurface
Bidding
IN

Ready Mix
Post-Bid
Indianapolis, IN 46204

Olio Road & 146th Street Improvements
Results
$6,082,738 est. value
Noblesville, IN 46060

Institution and Park Road Maintenance
Bidding
IN

2020 Mill, Patch, and Resurface Roadway Maintenance
Post-Bid
Avon, IN 46123

New Entrance Roundabout
Results
Terre Haute, IN 47802

Reported 01/15/2021 12:00 AM
Project Title

2020 Resurfacing Drainage Improvements

Physical Address View project details and contacts
City, State (County) Sweetser, IN 46952   (Grant County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Resurfacing Drainage Improvements of parts of Main St, Davis St, and Gayle St Project. S. Main Street: From Railroad Tracks to State Road 18, mill entire roadway section, sweep clean, 4.0 inches of HMA patching where needed, tack coat, and pave with 1.5 inches of Hot Mix Asphalt surface. Replace 365 feet of curb and gutter. Replace manholes, inlets, and 250 LFT storm sewer pipe. Adjust manholes, inlets, and water valves if needed. Davis Street: From Main Street to Meridian Street, mill butt joints, sweep clean, 4.0 inches of HMA patching where needed, tack coat, and pave with 1.5 inches of Hot Mix Asphalt surface. Replace inlet and 310 LFT storm sewer pipe. Adjust manholes, inlets, and water valves if needed. N. Main Street: From State Road 18 to Town Limits, mill entire roadway section, sweep clean, tack coat, and pave with 1.5 inches of Hot Mix Asphalt surface. Adjust manholes, inlets, and water valves if needed. Gayle Street: From Dead End to Wes Way, mill butt joints, sweep clean, 4.0 inches of HMA patching where needed, tack coat, and pave with 1.5 inches of Hot Mix Asphalt surface. Adjust manholes, inlets, and water valves if needed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents