Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

District Roads Project
Term Contract
Bidding
$325,000 est. value
Pescadero, CA 94060

Half Moon Bay High School and Cunha Intermediate School Paving Project
Infrastructure
Bidding
Half Moon Bay, CA 94019

Smooth Streets Program
Infrastructure
Post-Bid
San Mateo, CA

Citywide Street Rehabilitation Package 2-B
Infrastructure
Post-Bid
$1,150,000 est. value
San Mateo, CA

Citywide Street Reconstruction Phase 2
Infrastructure
Results
$1,600,000 est. value
San Mateo, CA

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Grand Avenue and Airport Boulevard Streetscape Improvement Project
Infrastructure
Bidding
$2,600,000 est. value
South San Francisco, CA 94080

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

El Capitan Drive Pavement Repair Project
Infrastructure
Results
Millbrae, CA 94030

Pavement Replacement
Infrastructure
Bidding
$280,000 est. value

Phase Zero New Temporary Haul Road Project
Infrastructure
Post-Bid
East Palo Alto, CA 94303

General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Results
$5,000,000 est. value

Lincoln Elementary School Play Yard
Renovation, Alteration
Post-Bid
Burlingame, CA

Base Repair
Infrastructure
Results
Pacifica, CA

Last Updated 04/06/2022 01:41 PM
Project Title

Track 787 Crossing Improvements Project

Physical Address View project details and contacts
City, State (County) Redwood City, CA   (San Mateo County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of removing and disposing of approximately 187 linear feet of track including ties, excavation to a depth of 3 feet below existing ties, rebuilding the track bed and constructing new track and curved concrete panels at grade crossing along the existing alignment. Work shall also include the placement of approximately 190 linear feet of perforated pipe underdrain.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents