Similar Projects
Arona Road Bridge Replacement Project
New Construction, Infrastructure
Bidding
New Stanton, PA 15672

2022 Annual Pipe Bursting Contract
Term Contract
Bidding
Murrysville, PA

Request for Quotation - Materials Wheeling & Lake Erie Railway
Renovation
Post-Bid

Furnish Complete Curb Boxes
Term Contract
Post-Bid
Greensburg, PA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Pressure Reducing Vault Improvements Project Phase 2
Infrastructure
Bidding

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Bridge Repairs
Results

Replace Existing Water Main
Post-Bid
Ligonier, PA 15658

SR 4075 OV Pucketa Creek
Results
$100,000 to $199,999 est. value
PA

Furnish Type K Copper Pipe for Delivery to the New Stanton Yard
Post-Bid
New Stanton, PA

Install Water Pipeline for Waterline Replacement Project
Results
New Stanton, PA

Mountain Water Supply 30 Aerial Support Replacement
Infrastructure
Post-Bid
$160,000 est. value
Greensburg, PA

Waterline Relocation Project
Results
Mount Pleasant, PA

Reported 03/05/2022 12:00 AM
Project Title

Water Utility Lines and Pressure Control

Physical Address View project details and contacts
City, State (County) Ligonier, PA   (Westmoreland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of approximately 260 LF of 10 water line, 10,955 LF of 8 water line, 8,895 LF of 6 water line, water line appurtenances; water service lines, meters, meter pits, and water service line appurtenances; installation of two (2) new pressure reducing vaults (Mill Road & Gravel Hill), replacement of two (2) existing pressure reducing valves (Park Plan), replacement of two (2) existing control valves (Oakwood Hills), and replacement of an existing bridge structure with a new concrete box culvert.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Culverts.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents