Similar Projects
Centrum Deerfield Apartments
New Construction
Conception
Deerfield Beach, FL 33441

Centrum Deerfield Apartments
New Construction
Conception
Deerfield Beach, FL 33441

Harbourside at Hidden Harbour
New Construction - 1,072,674 SF
Design
$10,000,000 CJ est. value
Pompano Beach, FL 33062

Main Street Courts
New Construction, Build-Out - 39,456 SF
Design
$2,500,000 est. value
Davie, FL 33314

Block 58 - Bread Building
New Construction, Build-Out - 619,882 SF
Bidding
$100,000,000 est. value
Hollywood, FL 33020

Block 58 - Bread Building
New Construction, Build-Out - 619,882 SF
Bidding
$100,000,000 est. value
Hollywood, FL 33020

Nine Hollywood
New Construction - 106,284 SF
Post-Bid
$24,000,000 est. value
Hollywood, FL 33020

Senior Activity Center Project
New Construction - 8,000 SF
Post-Bid
Less than $4,500,000 est. value
Pompano Beach, FL 33069

Co-Developer for Development of Tallman III in Broward County
Results
Fort Lauderdale, FL 33319

2021 Covered Parking Structure
New Construction
Results
Southwest Ranches, FL 33331

Hollywood East
New Construction, Build-Out
Construction
$48,650,000 est. value
Hollywood, FL 33020

Dania Pointe
New Construction - 1,300,000 SF
Construction
$816,200,000 est. value
Dania, FL 33004

Ritz-Carlton Residences - Pompano Beach
New Construction, Build-Out
Pending Verification
Pompano Beach, FL 33062

Ritz-Carlton Residences - Pompano Beach
New Construction, Build-Out
Pending Verification
Pompano Beach, FL 33062

Hillsboro Mile Condo
New Construction
Conception
Hillsboro Beach, FL 33062

Last Updated 03/23/2022 12:00 AM
Project Title

Eurus at Miramar

Physical Address View project details and contacts
City, State (County) Miramar, FL 33027   (Broward County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Parking Garage
Contracting Method
Project Status Construction Commenced July 2019, Construction Complete as of October 2021
Bids Due View project details and contacts
Estimated Value $10,029,488
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project to include a clubhouse, two garage buildings, a maintenance building, and two pool pavilions.

Details

7 Apartments/Condominiums, 4 Stories Above Grade, 376,632 SF New Construction 280 Unit(s), 6 Acres, 1 Clubhouse/Social Club, New Construction, 2 Parking Garage, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents