Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

RFP - Culture, Parks, and Recreation Department Comprehensive Master Plan
Term Contract
Bidding
Greeley, CO 80631

RFP Engineering - Central Public Works Fuel Station Design And Construction
Term Contract
Bidding
Hudson, CO 80642

12th Street Outfall: Phase 1A - Water and Sanitary Relocations
Post-Bid
Greeley, CO 80631

Heating Plant Boiler #3 Replacement
Post-Bid
Greeley, CO 80639

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

RFQ Engineering - US 34 WCR 17 Intersection Improvements Design Services
Infrastructure
Bidding
$500,000 CJ est. value
Greeley, CO 80631

Design Services for the University of Northern Colorado 11th Avenue West Parking and Site Improvements.
Post-Bid
Greeley, CO 80639

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Engineering, Planning and Development
Post-Bid

Multimedia Environmental Compliance Engineering Support for Navy, Marine Corps, and other DOD Installations, and Federal Agencies
Results
Norfolk, VA

Colorado Boulevard and Tipple Parkway Intersection Improvement
Post-Bid
Frederick, CO

National Architecture/Engineering/Interiors (IDIQ) Contract
Results
Less than $25,000,000 est. value

Last Updated 10/20/2022 05:44 AM
Project Title

RFP Engineering - Cascade Park Drainage Improvements

Physical Address View project details and contacts
City, State (County) Greeley, CO 80631   (Weld County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Construction start expected November 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project intends to produce final design plans for localized capital storm drainage improvements to reduce system clogging and protect residences from frequent flooding. It is not the City's expectation that upsizing the 30" storm line to Sanborn Park will be feasible. Major design tasks and timeline for the stormwater project include: 1. Complete a detailed evaluation and analysis of the storm drainage system in Cascade Park along and review of the 28th Avenue Drainage Basin Master Plan by early April 2023; 2. Complete an Alternatives Analysis by July 2023; 3. Complete the construction bid package by December 2023. City of Greeley Stormwater Division priorities for this project will be based on a benefit cost analysis where benefits include: flood protection of structures; debris performance efficiency, and increase in quality of life for neighborhood residents. Other expectations: 1. Consultant should be prepared to meet at least once per month with the City Team, with other meetings as necessary dependent on workload and schedules. 2. Frequent, honest and straightforward communication will be a must. Question Acceptance Deadline 11/04/2022 06:00 PM EDT Questions are submitted online No The method of Contractor Selection has not been Determined at this time

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents