Similar Projects
Quanicassee Road Grade, Base, Drainage
Post-Bid
Caro, MI 48723

Construction for the Steel and Wallbridge Drain Astwood Mews Branch
Post-Bid
Saint Johns, MI 48879

Cass Road Drain
Results
Less than $1,406,191 est. value
Traverse City, MI

Placing Scour Countermeasures, Articulating Concrete Block, Riprap
Results
Bay City, Saint Louis, MI 48706

Retaining Wall Replacement
New Construction
Post-Bid
Ann Arbor, MI 48105

DDA Riverfront Property: Design-Build Seawall Reconstruction
Results
Detroit, MI 48226

Site Drainage Improvements
Post-Bid
Port Huron, MI 48060

Fish Dam Creek Crossing - Bridge/ Culvert
Results
MI

Church Road Over Muskrat Creek
Post-Bid
Saint Johns, MI 48879

Korpela to Wakefield Stateline Grade Extension Culvert and Bridge Replacement
Results
MI

Mont Ripley Slope Stabilization
Post-Bid
Less than $900,000 est. value
Hancock, MI

Public Safety Campus Expansion, Phase II
Results
Walled Lake, MI

Multiple Blocks - W and S - Storm Water Outlet Erosion Repair, SE Huron Parkway and Hubbard
Post-Bid
Ann Arbor, MI 48109

Restoration and Preservation of Hunter House - Drainage and Masonry
Results
Birmingham, MI

Repair Waterfront Structures USCG Station St. Ignace St. Ignace, MI
Post-Bid
$500,000 to $1,000,000 est. value
Saint Ignace, MI

Last Updated 02/04/2022 08:18 AM
Project Title

Red Run Drain - Freedom Hill Bank Restoration

Physical Address View project details and contacts
City, State (County) Sterling Heights, MI 48312   (Macomb County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Red Run Drain Restoration – Phase 1 project will include the installation of in-stream j-hook structures, stream bank stabilization, and minor dredging with restoration of native seed, plugs, and trees. The project also includes construction of a shared use non-motorized gravel path and native plantings along the Sterling Relief Drain and Red Run Drain from Schoenherr Road to Metropolitan Parkway.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents