Similar Projects
San Clemente Marine Safety Headquarters
New Construction
Conception
San Clemente, CA

Emergency Operating Center (EOC) at Platinum Triangle - City of Anaheim
New Construction
Conception
$5,000,000 est. value
Anaheim, CA

Swallows Creek
Demolition, New Construction, Infrastructure - 91,520 SF
Design
$10,000,000 CJ est. value
San Juan Capistrano, CA 92675

Industrial Warehouse
New Construction, Infrastructure - 101,170 SF
Design
$13,700,000 CJ est. value
Orange, CA 92865

RFP Design - Electrical Design Services for City Hall and Bell Tower Regional Community Center (BTRCC) Interior LED Lighting Conversion
Renovation
Bidding
$400,000 CJ est. value
Rancho Santa Margarita, CA 92688

JRWSS Bradt Warehouse
New Construction, Infrastructure - 1,925 SF
Bidding
$500,000 CJ est. value
San Clemente, CA 92672

Rapid Response Single Award Task Order Contract (SATOC)
New Construction
Post-Bid
Less than $95,000,000 est. value

General Contractor for Office Renovations for 9th and 10th Floor
Renovation
Post-Bid
$80,000 est. value
Orange, CA 92868

Restroom Mobile Home and Locker Room Remodel in Orange County
Renovation
Results
CA

Lifeguard Tower Refurbishments
Renovation
Results
Huntington Beach, CA 92468

Junior Lifeguards Building - 19F13 - City of Newport Beach
New Construction
Construction
$3,150,000 CJ est. value
Newport Beach, CA 92663

Vineyard Church Campus
New Construction, Infrastructure, Renovation - 31,837 SF
Pending Verification
$5,900,000 CJ est. value
Laguna Niguel, CA 92677

Lincoln Way Warehouse
Demolition, New Construction, Infrastructure - 88,000 SF
Pending Verification
$48,000,000 CJ est. value
Garden Grove, CA 92841

Corporation Yard Building "J" Structural Repair and Upgrades - City of San Clemente
Renovation
Conception
$250,000 CJ est. value
San Clemente, CA 92672

Administrative Office Building Replacement - East Orange County Water District (EOCWD)
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Orange, CA 92866

Last Updated 05/25/2023 10:22 AM
Project Title

Collections Yard Relocation and Warehouse Demolition at Plant No. 2

Physical Address View project details and contacts
City, State (County) Huntington Beach, CA 92646   (Orange County)
Category(s) Government/Public, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Misc. Buildings
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $5,675,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Project will be installing three (3) warehouse stations, relocating the Collections Yard, including the construction of a covered truck parking area, to the CM Trailer Parking Lot, and demolishing the existing Warehouse and Collections Yard at Plant No. 2. Location & Description of the Work: The Project is located at Plant No. 2 at 22212 Brookhurst Street, Huntington Beach, CA 92646. The Project will be installing three (3) warehouse stations, relocating the Collections Yard, including the construction of a covered truck parking area, to the CM Trailer Parking Lot, and demolishing the existing Warehouse and Collections Yard at Plant No. 2. License Requirements "A" or "B" Online Q&A No Response Format Electronic Type of Award Lump Sum Estimated Bid Value $4,518,564 Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% All questions submitted by email shall contain the following title in the Subject line PROJECT NO. P2-127 Bidder Questions. All questions submitted by email shall be submitted in accordance with the requirements set forth in the Instructions to Bidders in the section entitled Bidders Questions Submitted by Electronic Mail. Telephone questions will not be accepted. Any questions received after this date may not receive a response. All communications concerning this IFB must be in writing. Written questions regarding details of this IFB will be accepted (i.e., must be received) by OC SAN until 1:00 P.M. (Pacific Time Zone), March 23, 2023. Written questions must be sent to the attention of Wai Chan, Contracts Administrator at Contracts, Purchasing & Materials Management Division of the Orange County Sanitation District at 10844 Ellis Avenue, Fountain Valley, California 92708 or by email at construction@ocsan.gov A. Demolition work to include the following: 1. Existing Plant 2 Warehouse, including utilities, footings, landscaping, and other facilities. 2. Existing Guard Shack and utilities. 3. Covered Parking Structures at Existing Collections Yard. 4. Guard Railing and Guard Posts at New Collections Yard. B. Work to include relocation of the following: 1. Conex boxes at existing Collections Yard to be relocated to new Collections Yard. 2. Two existing fire hydrants and guard posts to be relocated at new Collections Yard. 3. One existing backflow device and guard posts to be relocated at new Collections Yard. 4. Two existing light poles to be relocated at new Collections Yard. C. Warehouse Station A (WSA) and new Collections Yard to include: 1. Prefabricated structure for WSA, with related grading, paving, power supply feeder, receptacles, grounding, fencing, gates, security cameras, and utilities. 2. New Collections Yard, with fencing, gates, a prefabricated covered parking structure, site lighting and utilities, a vehicle washdown pad, slurry sealing of existing pavement, and new paving as indicated on drawings. 3. CNG compressors and fueling system at new Collections Yard. 4. Air filling equipment at new Collections Yard. D. Warehouse Station B to include: 1. Prefabricated canopy for WSB, with related floor slab, footings, and protection of existing utilities. 2. Electrical feeder to WSB from power Distribution Center H. E. Warehouse Station C to include: 1. Fencing and gates inside existing Maintenance Storage and Shops. F. Oil Dock and Security Booth work to include the following: 1. Replacing power feeders to existing Oil Dock with new feeders from the existing Centrifuge Building. 2. Replacing IT infrastructure for the existing Oil Dock, with new fiber optic connection to existing Centrifuge Building. 3. New fencing to close in Oil Dock area, and security camera for Oil Dock area. 4. New Security Booth at Bushard Gate, with related IT and electrical service, krails and pavement striping.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents