Similar Projects
Snow Removal Services, Cargo Inspection Facility, Detroit, MI
Design
Detroit, MI 48216

2020 Special Event Waste Management
Post-Bid
Ferndale, MI

Electric Line Clearance and Vegetation Management Services
Post-Bid
Marshall, MI

Snow Removal for DEQ 635 Filley Street District Office
Results
Lansing, MI

Waste Disposal and Recycling Services
Results
Less than $60,000 est. value
Wayne, MI

E-Waste and Recycling Services
Term Contract
Post-Bid
Wayne, MI

Dart Auditorium-Fire Curtain And Rigging Replacement
Results
Pinckney, MI

Mowing and Snow Removal Services
Term Contract
Post-Bid
Pontiac, MI 48342

Property Maintenance
Term Contract
Results
Kalamazoo, MI

2020 Sidewalk Snow and/or Ice Removal
Post-Bid
Wayne, MI 48184

Office & Laboratory Cleanup, USGS Lansing MIUSA
Results
Lansing, MI 48911

OSN Waste Removal and Recycling Services
Post-Bid
Detroit, MI 48202

2019 Medical Waste Removal and Disposal
Results
MI

Timber Sale - 602 Gravel Pit
Post-Bid
Bessemer, MI

Snow Removal Services
Results
Warren, MI

Last Updated 05/13/2021 01:55 PM
Project Title

Port Huron North Pit

Physical Address View project details and contacts
City, State (County) Benton Harbor, MI   (Berrien County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and disposal of stormwater, sedimentation, and debris accumulated in one of the counterweight pits under the Bicentennial Bascule Bridge by the contractor. One cell is approx. 25 ft by 25 ft. The two cells are connected for a total of 1250 sq. ft. The pit could hold up to 8 to 12 inches of sedimentation and stormwater totaling approximately 47 cubic yards depending on weather conditions. The cells are 21’ deep, and there is approximately another 17’ from the top of the cells to the road surface. The contractor is responsible for removing and disposing all the material in the pits. Once the pit cells are substantially empty the bottom slab must be cleaned with a power washer to remove all of the sediment.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents