Similar Projects
Mount Peace Cemetery Expansion
Alteration
Conception
Akron, OH 44303

Hudson Greenway Trail - State of Ohio
Infrastructure, Alteration
Conception
$750,000 est. value
Hudson, OH 44236

Wyoga Lake Road Infrastructure & Apartment Building
New Construction - 2,000 SF
Design
Cuyahoga Falls, Stow, OH 44224

Girl Scouts STEM Center for Excellence / Peninsula
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Peninsula, OH 44264

Bridge Preservation - IR 77
Demolition, New Construction, Infrastructure
Bidding
$1,397,250 CJ est. value
Akron, OH 44320

East Exchange Complete Streets
Infrastructure
Bidding
$9,733,501 CJ est. value
Akron, OH 44304

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 Backflow Device Testing Repairs and Inspections
Infrastructure
Post-Bid
Akron, OH

2021 Commodore Cove Water Main Replacement
Infrastructure
Results
$589,521 est. value
Aurora, OH 44202

Kent Road Waterline Improvement
Infrastructure
Results
$659,631 est. value
Stow, OH 44224

Atterbury Boulevard Culvert Extension
Infrastructure
Construction
$67,473 CJ est. value
Hudson, OH 44236

Atterbury Boulevard Culvert Extension
Infrastructure
Construction
$67,473 CJ est. value
Hudson, OH 44236

White Pond Drive Mixed Use
New Construction, Infrastructure - 51,720 SF
Pending Verification
$75,000,000 CJ est. value
Akron, OH 44313

Wallhouse Inn
New Construction, Infrastructure - 66,870 SF
Pending Verification
$10,000,000 CJ est. value
Hudson, OH 44236

Akron Zoo - State of Ohio
Infrastructure
Conception
Akron, OH 44307

Last Updated 11/27/2022 07:31 AM
Project Title

Storm Water Improvements in Preston Park

Physical Address View project details and contacts
City, State (County) Cuyahoga Falls, OH 44221   (Summit County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $128,880 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Storm Water Improvements in Preston Park at the Municipal Building in the City of Cuyahoga Falls. Bidders must use the printed forms provided therefore, as none other will be accepted. Each proposal must contain the full name of the party or parties making the same, and all parties interested therein, and must be accompanied by a bond or certified check in the sum of five percent (5%) of the total amount of the bid, on a solvent bank, as a guarantee that if the bid is accepted, a contract will be entered into. The Director of Public Service reserves the right to reject any or all bids and to waive any informality in any proposal. Bids will be received only from parties that have obtained a recorded bid set of drawings and specifications. The successful bidder must post a Performance, Payment, Maintenance bond in the amount of one hundred percent (100%) of the total amount of the bid. The City of Cuyahoga Falls shall apply a Local Bid Preference to this invitation as outlined in Section 181.08 of the Codified Ordinances. DOMESTIC STEEL USE REQUIREMENTS AS SPECIFIED IN SECTION 153.011 OF THE REVISED CODE APPLY TO THIS PROJECT. COPIES OF SECTION 153.011 OF THE REVISED CODE CAN BE OBTAINED FROM ANY OF THE OFFICES OF THE DEPARTMENT OF ADMINISTRATIVE SERVICES." We are an Equal Opportunity Employer.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents