Similar Projects
SR 52 / US 82 at Little River and Overflow - Bridge Rehab
Infrastructure
Design
$1,000,000 CJ est. value
Tifton, GA 31793

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

New Road for Tift County Development Authority
Infrastructure
Bidding
$2,000,000 CJ est. value
Tifton, GA 31794

Commerce Way Redevelopment Project
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Tifton, GA 31794

Commerce Way Redevelopment Project
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Tifton, GA 31794

Agriculture Meter Installation
Infrastructure
Results

Old Ocilla Road Turn Lane Modifications and Bowen Road Improvements
Infrastructure
Results
$282,764 CJ est. value
Tifton, GA 31794

Natural Gas Main Improvements to Serve Orgill
Infrastructure
Bidding
$125,000 CJ est. value
Tifton, GA 31794

FY2022 LMIG Waterline Replacements
Infrastructure
Post-Bid
$300,000 est. value
Tifton, GA

Water, Sewer and Street & Drainage Improvements to serve the West Phillipsburg Community
Infrastructure
Results
$6,719,579 CJ est. value
Tifton, GA 31794

RFQ Contractor - USDA ARS Laboratory at Tifton
New Construction, Infrastructure - 46,008 SF
Post-Bid
$100,000,000 CJ est. value
Tifton, GA 31793

Len Lastinger Elementary School Renovations
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$250,000 CJ est. value
Tifton, GA 31794

Adams Road Culvert Improvements
Infrastructure
Post-Bid
$80,000 CJ est. value
Tifton, GA 31733

2022 and 2023 Local Maintenance Improvement Grant (LMIG) 2023 Addl. Local Maintenance Improvement Grant (LMIG)
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Omega, GA 31775

Express Oil Change / Tifton
New Construction, Infrastructure - 5,670 SF
Post-Bid
$1,500,000 CJ est. value
Tifton, GA 31793

Last Updated 02/10/2023 02:12 PM
Project Title

ARPA Water Main Replacements

Physical Address View project details and contacts
City, State (County) Tifton, GA 31794   (Tift County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days. Work To Be Done: The work shall generally consist of furnishing all products and performing all labor necessary to install the following (see Plans and Specifications for complete details and description): Installation of approximately 2-8 water mains along city streets in Tifton, Georgia. The waterline replacement work is being performed to upsize and/or replace leaking pipe segments prior to paving operations along the same corridors. Other work involves includes water service transfers, fire hydrant replacements, removal and replacement of roadway pavement, driveways, curb & gutter, etc., traffic control, erosion control, and other miscellaneous work. Bonds: Bids shall be accompanied by a bid bond or certified cashiers check in an amount not less than 5% of the base bid. All bonds shall be by a surety company licensed in Georgia with an A minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of Bests Key Rating Guide Property Liability. Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a Power of Attorney authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. Funding: This project will be funded through a combination of ARPA State Fiscal Recovery Funds and local funds. All permits required for the construction of this project are expected to be obtained before the bid date. Acquisition of property for easements, right of way, etc. are expected to be obtained before the bid date. Reservation of Rights: Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents