Similar Projects
Submersible Pumps and Wastewater Lift Stations
New Construction
Bidding
Cocoa, FL 32922

Lift Station, Grease Trap and Septic Tank Pump and Maintenance
Term Contract
Results
Less than $300,000 est. value
Viera, FL 32940

Repair Lift Station Pumps Bldgs. 650 and 1497 & Replace Lift Station Bldg. 943, Patrick AFB, FL
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Lift Station 93 Rehabilitation
Results
Less than $106,966 est. value
Palm Bay, FL 32909

Lift Station and Force Main C-01 Replacement
Results
$547,000 est. value
Merritt Island, FL 32953

Lift Station No. 11 Replacement Young Street
Results
Melbourne, FL 32901

Intermediate Pump Station Improvements
Results
$457,300 est. value
Cape Canaveral, FL 32920

Lift Station #3 Rehabilitation
Results
$340,000 est. value
Cape Canaveral, FL 32920

Marina Lift Station Improvements
Results
Less than $522,000 est. value
Titusville, FL 32796

Lift Stations J-03, J-04, and J-05 Rehabilitation
Results
Port Saint John, FL 32927

Lift Station S-21 Rehabilitation
Results
$60,216 est. value
Viera, FL 32940

Rehabilitation of Brevard County Lift Station M-17 and V-11
Results
$196,930 est. value
Merritt Island, FL 32952

Lift Station T-09 Rehabilitation
Results
Viera, FL 32940

Lift Station N-01 Replacement
Results
$544,090 est. value
Viera, FL 32940

Hall Road Pump Station
New Construction
Results
$1,722,320 est. value
Merritt Island, FL 32953

Last Updated 07/22/2020 12:35 AM
Project Title

Lift Station 43 Rehabilitation

Physical Address View project details and contacts
City, State (County) Palm Bay, FL 32907   (Brevard County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work may include construction, removal and replacement of, but not limited to, the following: The rehabilitation of the lift station consists of the decommissioning/removal of the valve pit, installing new piping and valve assembly, lining of the wet well, replacement of pump pedestals, guide rails, discharge piping, and related appurtenances. Rails and discharge piping will be schedule 40, 316, stainless steel with the exception of reducer and two 45-degree bends which are to be ductile iron with a 12-mil epoxy coating on the inner surface.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents