Similar Projects
Chester M. McPherson Jr. Pier Repairs
Infrastructure
Results
$93,145 est. value
Ocean Springs, MS

Bayou La Croix Boat Launch
Infrastructure
Bidding
Bay Saint Louis, MS

Hurricane Zeta Municipal Harbor Slip Repairs
Post-Bid
Bay Saint Louis, MS

Point Park Pier and Parking Improvements
Infrastructure
Post-Bid
Pascagoula, MS 39567

Installation of Wood Fillers in the Pass Christian Harbor
Post-Bid
Pass Christian, MS

West Small Craft Harbor Fishing Pier Hurricane Zeta Repairs
Infrastructure
Post-Bid
Pass Christian, MS

Hurricane Zeta Repairs East Small Craft Harbor
Infrastructure
Post-Bid
Pass Christian, MS

Repair Marina Piers
Alteration
Design
$1,000,000 to $5,000,000 est. value
Biloxi, MS 39530

Biloxi River Boat Ramp Project
Infrastructure
Bidding
MS

Terminal C Dock Fender Damage Repairs
Infrastructure
Post-Bid
Pascagoula, MS

Bells Ferry Boardwalk Removal and Replacement Project
Post-Bid
Pass Christian, MS 39571

West Biloxi Boat Launch Project
Infrastructure
Post-Bid
MS

River Park Pier Repair Project
Infrastructure
Post-Bid
Pascagoula, MS 39581

Reported 11/30/2021 12:00 AM
Project Title

Repair Marina Piers

Physical Address View project details and contacts
City, State (County) Biloxi, MS   (Harrison County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all equipment, labor, supervision and materials necessary to restore the Marina Piers. The work shall include a phased approach to rebuild the Marina including the finger piers and the restroom building on the west pier. Restoring the floating docks on the east pier and providing a new transition sump and dispensers for the fueling system. New accessories and gangways will be provided. New electrical and mechanical systems will be provided and portions of the concrete and asphalt drive will be replaced. The project will be phased as follows: 1- Fuel Dock and Pier area along the shoreline. 2- West Pier including the pavilions. 3- East Pier and the floating docks. Each Phase will be turned over to the Government upon completion.

Details

Division 26 - Electrical.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents