Last Updated | 08/16/2022 03:04 AM |
Project Title | Steam Generating Facility Control System Upgrade / Replacement |
Physical Address | View project details and contacts |
City, State (County) | Birmingham, AL 35233 (Jefferson County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $550,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Steam Generating Facility Control System Upgrade / Replacement located at 1300 6th Avenue South; Birmingham, AL 35233 . Prime Contractors that are properly licensed for this type of work are required to prequalify in order to bid. For more information about the project and how to prequalify, please go to the UAB Facilities Bid Calendar at website, refer to the bid date above, and click on the specific project number. Applicants for Prequalification are strongly encouraged to submit applications at the earliest date possible following the first date of advertisement. UAB will review applications as submitted and notify applicants within two (2) working days of submission. Applications received after the date of the Pre-bid Conference may not be considered. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SCOPE OF WORK Replace existing hybrid control system with a new system of a single manufacture. All control hardware shall be replaced with new, including network components and workstations. New components shall fit into existing control panels and new I/O shall be wired to existing field terminal strips. Existing terminal strips and field wiring shall remain. Provide new termination drawings in CAD format to make any translation from new I/O numbers to existing wire numbers. Basis of design control hardware is Rockwell and Honeywell. ESTIMATED COST of WORK ($525,000 to $550,000) |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |