Similar Projects
Water Meter Replacement
Infrastructure
Bidding
$500,000 est. value
McCaysville, GA

Distribution System Small Line Replacement Program - Package 1
Infrastructure
Bidding
$750,000 to $1,500,000 est. value
Columbus, GA

Automated Metering Infrastructure
Post-Bid
Temple, GA

Water Meter Testing Services
Term Contract
Post-Bid
Gainesville, GA

2019 CDBG Water System Improvements
Results
Milan, GA 31060

Replacement and Installation of Fire Hydrants Standby-Miscellaneous Construction
Results
Less than $100,000 est. value
GA 30303

Raw Water Transmission Main Renewal Project
Infrastructure
Bidding
$300,000 est. value
Atlanta, GA

Public Water System Improvements
Infrastructure
Post-Bid
Lake Park, GA

New Water Meter Installation Project
Results
Less than $1,960,250 est. value
Gainesville, GA 30501

Water System Improvement - Labor Only
Infrastructure
Bidding
$800,000 est. value
Ludowici, GA

Line Creek Transmission Main and Distribution System
Infrastructure
Post-Bid
$8,500,000 est. value
GA

Force Main Replacement Phase 1
Results
Buford, GA 30518

Water System Improvement - Materials Only
Infrastructure
Bidding
Ludowici, GA

Water Main Extension for Construction Activities
Infrastructure
Post-Bid
Bainbridge, GA

Baxley Water Meter Citywide Replacement
Results
Baxley, GA

Last Updated 06/09/2022 02:25 AM
Project Title

Buchanan Highway Water Main Extension

Physical Address View project details and contacts
City, State (County) Dallas, GA 30132   (Paulding County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of approximately 7,150 linear feet of 8" DIP water main, 12 fire hydrant assemblies with valves, 8 gate valves, approximately 120 linear feet of 16" steel casing installed by jack & bore method, connections to existing water mains, fittings, water service lines and appurtenances, water meters, asphalt pavement patching, installation and maintenance of erosion control measures, traffic control, permanent grassing and other related work. The contractor will furnish all materials, with the exception of the water meters, and perform all work associated with the project.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents