Similar Projects
Sabine Neches Waterway PA8 Containment Dike Raise
Design
$1,000,000 to $5,000,000 est. value
TX

Eagle Mountain Dam Side Channel Spillway Seepage Remediation
Renovation
Bidding
$1,830,000 est. value
Fort Worth, TX 76135

Choke Canyon Dam Infrastructure Improvements
New Construction
Bidding
Corpus Christi, TX

Lower Bois d'Arc Creek Reservoir Dam and Intake Project - Proposal Package 4A CR2700 Improvements
Post-Bid
$750,000 est. value
Honey Grove, TX 75446

Lower Bois D`Arc Creek Reservoir Dam and Intake Project - Proposal Package 3 Reservoir Cleanup
Post-Bid
$750,000 est. value
Honey Grove, TX 75446

Tom Miller Dam Replacement Chains
Results
Less than $175,000 est. value
Austin, TX

Dam Reconstruction at Bastrop State Park
Results
$7,500,000 to $8,300,000 est. value
Bastrop, TX 78602

Lake Ralph Hall: Leon Hurse Dam
Construction
$135,000,000 to $165,000,000 est. value
TX

Williams Creek Watershed Site 1 Upgrade
New Construction
Bidding
$5,000,000 to $10,000,000 est. value
Albert, TX

Sister Grove Regional Water Resource Recovery Facility Outfall Pipeline 1 - Solicitation Set 01 - Large Diameter Tunnel Work and Large Diameter Pipe Materials
Post-Bid
TX

Houston Ship Channel, Mid Bay Placement Area (PA) Improvements
Results
$5,000,000 to $10,000,000 est. value
TX 77571

Construct the Unit 6 Improvements
New Construction
Bidding
Brownsville, TX

LBCR Dam and Intake Project - Proposal Purchase Package 6B - Barrier and Warning System
Post-Bid
$350,000 est. value
Honey Grove, TX 75098

Houston Ship Channel (HSC) Placement Area 6 Containment Dike Raise.
Results
$1,000,000 to $5,000,000 est. value
TX

FY21 Houston Ship Channel Spilman Placement Area Improvements
Post-Bid
TX

Reported 10/27/2021 12:00 AM
Project Title

Lewisville Dam Safety Modification (LDSM) Spillway

Physical Address View project details and contacts
City, State (County) Lewisville, TX   (Denton County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $25,000,000 to $100,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the project includes all work required for construction to make necessary repairs to Lewisville Dam, Lewisville, Texas. The measures to address the structural stability concerns associated with PFM 6 consist of posttensioned anchors installed through the ogee weir, and an upstream geomembrane blanket. An anchor field testing program to gather foundation information to verify the anchoring capacity assumptions of the Eagle Ford shale foundation is complete with the relevant data and reports included in the Design Documentation Report and Geotechnical Data Report. A work platform will be required to install the anchors along the downstream slope of the monoliths. Install 73 post-tensioned strand anchors on the spillway. The anchors will be founded approximately 130 feet below the spillway weir foundation. All anchors will be installed and tensioned before performing any demolition on apron slabs. Install permanent load cells on one anchor per monolith. Install cable through trench cut into weir to right abutment, up the abutment to a terminal box at the top of the abutment for monitoring. Test anchors as specified and per the PTI.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents