Similar Projects
SR 14, I-205 to SE 164th Avenue Auxiliary Lanes
Infrastructure
Bidding
WA

I-90, SR18 I/C to Deep Creek - Interchange Improvements and Widening Project
Infrastructure
Bidding
WA

Curb Management Plan
Infrastructure
Post-Bid
$150,000 to $225,000 est. value
Bellevue, WA 98007

Irrigation Design, SR 530 Slide Memorial
Alteration
Post-Bid
WA

Pavement Repair and Manhole Adjustment 2021
Alteration
Results
WA

Riverwalk Drive SE Non-Motorized Improvements
Infrastructure
Results
Auburn, WA 98092

65th Campus Development South Parking Lot Construction
Demolition, Alteration
Bidding
$1,750,000 to $1,955,000 est. value
Vancouver, WA 98661

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Post-Bid
Less than $343,000 est. value

Engineering/Architectural Services for First Avenue Plaza Improvements
Renovation, Alteration
Results
Walla Walla, WA

San Juan County Prune Alley Street Improvements
Infrastructure
Bidding
$3,500,000 to $3,900,000 est. value
Eastsound, WA 98245

Bloedel Donovan Park Building And Site Renovations
Renovation
Post-Bid
Less than $500,000 est. value
Bellingham, WA

Construction of the 34th Avenue S, South 166th Street to South 160th Street
Infrastructure
Results
$6,250,000 to $7,250,000 est. value
Sea-Tac, SeaTac, WA 98188

Campus Development Construction Surveying Services
Infrastructure
Bidding
Vancouver, WA 98661

Sequim-Dungeness Way and Woodcock Road
Infrastructure
Post-Bid
$900,000 to $1,000,000 est. value
Sequim, WA 98382

Ostrich Bay Creek Stormwater Treatment
Infrastructure, Alteration
Results
$1,000,000 to $1,300,000 est. value
Bremerton, WA

Reported 10/05/2021 12:00 AM
Project Title

Sylvester Street Safety Improvements

Physical Address View project details and contacts
City, State (County) Pasco, WA 99301   (Franklin County)
Category(s) Heavy and Highway, Professional Services
Sub-Category(s) Engineering, Paving/Reconstruction, Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected November 2021, Construction Completion Expected January 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project will design improvements consisting of road reconfiguration for Sylvester Street between Road 54 and N 3rd Avenue. The existing four-lane roadway segment will be converted to a three-lane segment. Other improvements will include signal upgrades and modification, bicycles lanes, parallel parking, and pedestrian enhancements including new street crossings, rapid flashing beacons, sidewalk, and ADA curb ramp retrofits. This project is estimated to begin November 2021 and both the design and right-of-way (ROW) phases are anticipated to be completed by January 2023.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents