Similar Projects
Aspen Dental
Build-Out
Design
Fort Worth, TX 76028

Biolife Plasma Center
Renovation - 11,500 SF
Design
$3,000,000 est. value
Fort Worth, TX 76132

Quest Diagnostics
Renovation - 1,300 SF
Post-Bid
$90,000 est. value
Lake Worth, TX 76135

Baylor Emerus Medical Office Building
Renovation - 34,229 SF
Post-Bid
Mansfield, TX 76063

JPS-200 Magnolia Office Suite Renovation
Renovation
Results
Fort Worth, TX 76104

Spine Team Texas Clinic
New Construction - 8,600 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Fort Worth, TX 76244

Fort Worth Fertility Offices
Build-Out - 1,900 SF
Construction
Southlake, TX 76092

Texas Oncology Offices
New Construction - 20,000 SF
Design
$4,000,000 est. value
Fort Worth, TX

Aspen Dental
Build-Out
Post-Bid
Fort Worth, TX 76116

Medical Office Building
New Construction - 8,120 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Fort Worth, TX 76177

Aspen Dental
Build-Out - 3,500 SF
Design
$300,000 est. value
Arlington, TX 76018

Octapharma Plasma Center
Build-Out - 15,000 SF
Post-Bid
$900,000 est. value
Fort Worth, TX 76106

Metroplex Foot & Ankle Offices
New Construction - 9,888 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Fort Worth, TX 76177

Aspen Dental
Renovation - 4,590 SF
Design
$300,000 est. value
Lake Worth, TX

Fresenius Kidney Care
Renovation - 1,800 SF
Post-Bid
$200,000 est. value
Fort Worth, TX 76107

Last Updated 04/22/2021 02:18 PM
Project Title

Westgate Plaza Medical Offices

Physical Address View project details and contacts
City, State (County) Grapevine, TX 76051   (Tarrant County)
Category(s) Medical
Sub-Category(s) Medical Office/Outpatient
Contracting Method
Project Status Construction Commenced first quarter 2020, Construction Complete as of January 2021
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Medical Office/Outpatient, 6,665 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents