Similar Projects
Hurricane IDA Reroof and Exterior Repairs at Loranger High School
Alteration
Post-Bid
$400,000 est. value
Loranger, LA 70446

Roof Replacement
Alteration
Post-Bid
$80,000 est. value
Independence, LA 70443

Tucker Elementary School Roof Replacement
Renovation
Results
$200,000 est. value
Ponchatoula, LA 70454

D/B - R-Panel Metal Roofing System Warehouse Building No.3 at the Port Manchac Inter-Modal Terminal
Alteration
Post-Bid
$400,000 est. value
Akers, LA 70421

District 62 Hurricane Ida Roof Repairs
Alteration
Post-Bid
$100,000 to $250,000 est. value

Reroof Of Existing Dinner Theater Building
Renovation
Post-Bid
$290,000 CJ est. value
Hammond, LA 70403

Martha Vineyard Elementary School Reroof
Renovation
Post-Bid
$407,000 CJ est. value
Ponchatoula, LA 70454

Champ Cooper Elementary School Reroofing
Renovation
Post-Bid
$407,000 CJ est. value
Ponchatoula, LA 70454

Council Chambers Roof Replacement
Renovation - 3,000 SF
Post-Bid
$18,234 CJ est. value
Hammond, LA 70401

City Hall Roof Replacement
Renovation - 8,500 SF
Post-Bid
$35,450 CJ est. value
Hammond, LA 70401

Hurricane IDA Reroof at Loranger Elementary and Loranger Middle Schools
Renovation
Post-Bid
$379,000 CJ est. value
Loranger, LA 70446

Roof Replacement The City of Hammond Police / Fire Fleet Building
Renovation
Post-Bid
$56,000 CJ est. value
Hammond, LA 70403

Perrin Early Learning Center Reroof
Renovation
Post-Bid
$290,000 CJ est. value
Ponchatoula, LA 70454

Kentwood High School Reroofing
Renovation
Post-Bid
$600,000 CJ est. value
Kentwood, LA 70444

Construction of Modernization of Housing, Miscellaneous Roof Repairs at Multiple Sites
Renovation
Post-Bid
$400,000 CJ est. value
Independence, LA 70443

Last Updated 08/24/2023 02:14 PM
Project Title

Pottle Hall Roof Replacement

Physical Address View project details and contacts
City, State (County) Hammond, LA 70402   (Tangipahoa County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $90,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A. Work shall include, but is not limited to, the following 1. Preparation of existing concrete roof deck, and all flashing substrates. 2. SBS-modified bitumen base ply (heat-welded). 3. SBS-modified bitumen cap sheet (heat-welded). 4. SBS-modified bitumen membrane flashings. 5. Liquid-applied, reinforced flashings. 6. Refer to related Sections for Insulation, Coverboard and Roof Edge Systems 7. All related materials and labor required to complete specified roofing necessary to receive specified manufacturers warranty. To furnish labor and materials to install new roofing membrane and insulation at pottle hall for the southeastern facility planning department

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents