Similar Projects
1200 West Carroll Avenue Office Building
New Construction
Conception
Chicago, IL 60607

Golf Mills Shopping Center Redevelopment
New Construction - 1,155,598 SF
Conception
Niles, IL 60714

725 W Randolph Mixed Use
New Construction
Design
Chicago, IL 60601

Thompson Center Redevelopment
New Construction, Renovation, Addition - 1,200,000 SF
Design
$280,000,000 est. value
Chicago, IL 60601

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

IDIQ MATOC for Healthcare and Medical Research Laboratory Facility Design Build Construction, In Support of The Defense Health Agency (DHA) Sustainment, Restoration and Modernization Program
New Construction
Post-Bid

Burley ES - LBP Mitigation and ACM Patch & Repair in the Ventilation System
Term Contract, Infrastructure
Results
$29,725 CJ est. value
Chicago, IL 60657

McCook and Thornton Reservoirs Rock Wall Stabilization and Geotechnical Instrumentation
Renovation
Results
$8,460,000 to $10,250,000 est. value
Bedford Park, IL 60501

Metra HQ Tenth Floor Remodeling
Renovation
Construction
$3,361,906 est. value
Chicago, IL 60661

North Side Apartment & Office Building
New Construction, Build-Out - 27,500 SF
Construction
Chicago, IL 60654

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

Dialysis Care Center Western
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Chicago, IL 60620

One Central
New Construction - 22,300,000 SF
Conception
$20,000,000,000 est. value
Chicago, IL

North Union Mixed Use Master Plan
New Construction - 533,645 SF
Design
$1,300,000,000 est. value
Chicago, IL 60632

DOM GI - Li & Bissonnette Lab
Renovation
Post-Bid
Chicago, IL 60637

Last Updated 11/10/2022 07:04 PM
Project Title

Pathology Lab Expansion

Physical Address View project details and contacts
City, State (County) Chicago, IL 60612   (Cook County)
Category(s) Commercial, Heavy and Highway, Laboratory
Sub-Category(s) Laboratory, Office, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $1,891,199 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description Renovation and expansion of existing Pathology Lab and Office space East of the corridor located on the 3rd floor Northwest wing of UIC Hospital. Project includes new exhaust duct run to 4th floor North roof with new fans. Approximately 1,380 SF of renovated office space and 1,480 SF of Lab space. Proposed construction to be completed in two phases and Lab grossing and processing capabilities must remain operational during construction. This Project is located at: 1740 W Taylor St, Chicago, IL 60612. The project site is located on the 3rd floor of the UIC hospital, in the northwest wing.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Rugs and Mats, Office Furniture, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents