Similar Projects
Mountain America Redevelopment
Demolition, New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
West Jordan, UT 84084

SoHi Apartments
New Construction, Infrastructure
Design
$40,000,000 CJ est. value
Salt Lake City, UT 84101

DFCM Construction UU Applied Sciences Building
New Construction
Design
$62,399,123 est. value
Salt Lake City, UT 84112

Electrical and Communications Duct Bank from AOC to Gate 7
Infrastructure
Bidding
$300,000 CJ est. value
Salt Lake City, UT 84116

RFQ D/B - UTA Design Team for Headquarters Redevelopment
New Construction, Infrastructure
Bidding
$20,000,000 CJ est. value
Salt Lake City, UT 84101

Kozo House Apartments
Demolition, New Construction, Infrastructure - 4,830 SF
Sub-Bidding
$80,000,000 CJ est. value
Salt Lake City, UT 84116

University of Utah Applied Science - Earthwork, Utilities, and Shoring
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Salt Lake City, UT 84112

Remodel - Williams Building Critical Network Remodel
Renovation
Post-Bid
$1,458,218 est. value
Salt Lake City, UT 84108

Grasmere Park Site Improvement Project
Infrastructure
Post-Bid
West Valley City, UT 84119

Miscellaneous Office and Conference Room Remodels at Granite Education Center
Renovation
Results
Salt Lake City, South Salt Lake, UT 84115

Delong Street And Parks and Public Lands Storage Yard Improvements
Results
Salt Lake City, UT

HEDCO Renovation and Upgrade Room 130
Renovation
Construction
Salt Lake City, UT 84112

Bueno Avenue Apartments
New Construction, Infrastructure
Pending Verification
$24,000,000 CJ est. value
Salt Lake City, UT 84102

Dowland Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
South Salt Lake, UT 84115

Pura Vita Senior Housing
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
West Jordan, UT 84088

Last Updated 10/10/2022 10:03 AM
Project Title

University of Utah Acute Care Complex OR Expansion

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84111   (Salt Lake County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $3,500,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Gramoll Construction has been selected by The University of Utah as the Construction Manager/General Contractor for the University of Utah ACC OR Expansion project, which is a Multi-phased project. Work hours are normal working hours, minus any noisy work such as saw cutting floors and jackhammering, or any shutdowns need to be coordinated with a PACE Plan with 4 weeks notice. There are patients that occupy floors 4-6 24/7 so all noisy work will need to be coordinated with the occupants. The 3rd floor has ongoing surgeries and there is an operating room in the hallway to the west. Material deliveries will need to be coordinated with the loading dock for times (hospital deliveries take precedent). Morning deliveries are strongly encouraged/required. There is a frieght elevator that offloads right by our job site that is 10. Any other Materials that are larger than 10 will need to be brought up the South Stairs. Parking will need to be offsite and workers will need to be shuttled in from the designated construction parking lots on campus (by Red Butte). If you have questions about phasing please call Dustin. PLEASE PAY CLOSE ATTENTION TO PAGE G103. This is the phasing plan. This is called a 2 phase project, with 2 sub phases involoved in the 2 overall phases. The work involved for the locker room and the Breakdown and Dirty Intake room will have to be done at nights or over weekends. This is an active surgical coridor and cannot be shut down during the week. They are done with Surgeries roughly at 6PM, Monday - Friday. There are no surgeries on the weekend. The Locker Room will be done in the first phase, and the Breakdown and Dirty Intake will be in phase 2. Please reference the overall schedule as well for feedback on the phased schedule. Once phase 1 is complete (Break Room, Conference Room, Temp trash/anesthesia room, Locker Room) they will be moving in for about 2 weeks. We need to move the existing folding partition from the current break room down the hall to this new break room in this phase. Once they move out, we start the demo of phase 2 (everything minus the temp trash/anesthesia) we need to get the permanent rooms (trash, anesthesia, specimen, materials management, physicians touchdown) completed so that they can then move out of the temp trash and anesthesia room. We then will finish those spaces to the shared office, anesthesia office and supply room, while finishing the 2 OR rooms. The roof Drains on level 2 have already been ran in the ceiling space, but the floor needs to be cored and the pipes need to be connected as part of this bid, but you dont need to bid the roughly 60' of primary and secondary roof drain piping already in the 2nd floor ceiling space. As a reminder, Masks are still a requirement at the hospital. Please make sure all employees will be wearing masks during the entirety of the project. All personel on the jobsite will also be required to be badged and go through the HIPA training before starting onsite. Gramoll is requesting proposals on Demolition, Misc Steel, Millwork, Doors and Frames, Ceiling Tile, Ceramic Tile, Flooring, Wall and Door Protection, Folding Partition Salvage/Move, Overhead Coiling Door, Corner Guards, Fire Sprinklers, Drywall, Joint Sealants, Mechanical, Plumbing and Electrical. Onsite walks will be coordinated with Gramoll Construction if needed. Please give a couple days notice so we can coordinate with occupants. Last Day to Submit Questions by - 10/4/22 @ 2:00 PM Final Addendum Posted by (If Needed) - 10/7/22 @ 2:00 PM Subcontractor & Supplier bids due by - 10/11/22 @ 12:00 PM Project Substantial Completion Date - 12/2023

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents