Similar Projects
LFR-15 - Replace 18", 15" and 12" with 24" Line along Claiborne Run from Morton Road to Kings Hill Road - County of Stafford
Infrastructure
Conception
$3,612,000 CJ est. value
Fredericksburg, VA 22401

Eastern Shore Drive Lynnhaven Drive Pump Station - PG100150 - City of Virginia Beach
Renovation, Infrastructure
Conception
$9,587,700 CJ est. value
Virginia Beach, VA 23451

Main Street Pump Station and Plant - City of Newport News
Infrastructure
Design
$9,285,000 CJ est. value
Newport News, VA 23601

Eastern Shore Drive - Phase I - City Of Virginia Beach
Infrastructure
Design
$43,400,000 CJ est. value
Virginia Beach, VA 23451

Well Installation and Well Abandonment in Middlebrook
Infrastructure
Bidding
$300,100 CJ est. value
Middlebrook, VA 24459

Well Installation and Well Abandonment
Renovation, Infrastructure
Bidding
$50,000 CJ est. value
Martinsville, VA 24112

Selma Estates Finished Water Booster Pump Upgrades
Infrastructure
Post-Bid
$300,000 CJ est. value
Leesburg, VA 20176

Construct a Private Water Well
Infrastructure
Post-Bid
$18,750 CJ est. value
Drakes Branch, VA 23937

Pump Station Repair Annual Services Contract
Term Contract
Results
Portsmouth, VA

Pump Station 153 Force Main Relocation
Renovation
Results
Newport News, VA

Savile Lane Pumping Station Rehabilitation Project
Renovation
Construction
$4,948,730 CJ est. value
McLean, VA 22101

Heritage Hunt Sewage Pumping Station, L52 Replacement, and Force Main Extension
Demolition, New Construction, Infrastructure
Construction
$26,423,957 CJ est. value
Gainesville, VA 20155

Western Pressure Zone Pump Station Backup Generator - 27503 - Town of Leesburg
Renovation
Conception
$661,500 CJ est. value
Leesburg, VA 20175

Eastern Shore Drive - Vista Circle Pump Station - PG100539 - City Of Virginia Beach
Infrastructure
Design
$18,100,000 CJ est. value
Virginia Beach, VA 23454

Well Installation and Well Abandonment
Infrastructure
Bidding
$20,000 CJ est. value
Gladstone, VA 24553

Last Updated 07/20/2023 03:12 PM
Project Title

Well Installation and Well Abandonment in Culpepper

Physical Address View project details and contacts
City, State (County) Culpeper, VA 22701   (Culpeper County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $125,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work: The contractor shall furnish all labor, supervision, equipment, tools, parts, supplies and materials, as necessary, to perform the services as described herein: Cost for Line Item #1 (include total cost for items A-H). These are known factors. Vendors must invoice for actual cost incurred as described herein. The initial bid should be an average cost/foot of depth for 150 feet (add other itemized costs such as mobilization/setup, etc.). Please note: 150 feet is an estimate, vendor will bill based on actual service performed, actual depth drilled (as verified on the GW-2 and VDH's Record of Inspection). Vendor will only be paid for actual well depth drilled, casing depth, grout depth, depth of drop pipe, pump, etc. Vendor must provide a detailed bid for 150 ft., any additional footage must be listed as additional services at a per foot rate. Vendors who submit bids for over or under 150 feet; will not be accepted. A) Construct a private water well that meets the location, construction specifications, water quantity, and water quality requirements of the Virginia Private Well Regulations (12VAC5-630-10 et seq., the Regulations). B) Tree Removal and Site Clearing: A pre-bid site visit is recommended to determine what if any tree removal or site clearing that may need to occur. Per the above referenced Permit, remove any trees and wood debris as described in the permit and haul away wood and debris unless notified otherwise. Costs of tree removal and site clearing should be included in initial bids. Any additional site clearing or tree removal required during installation must be submitted in writing to and approved by VDH in writing including an additional cost estimate. C) Construct the above class III(B) well with a minimum of 50' of casing and grout and in compliance with the Rappahannock-Rapidan Health Department Well Construction and Abandonment Permit 047-22-087 at 14020 Chestnut Fork Rd. Culpeper, VA 22701 in the location shown on the permit. The permit may contain additional conditions, notes, and information needed to construct the well. D) Provide, or subcontract with a licensed plumber and electrician to provide, the well pump, plumbing, and electrical required to convey the water under sanitary conditions from the well to the home plumbing system in the quantity required by the Regulations and the Virginia Uniform Statewide Building Code. This includes obtaining or assuring that the owner obtains all permits and inspections necessary by the local building authority in compliance with the Virginia Uniform Statewide Building Code. E) Disinfect the well and plumbing as required by the Regulations and provide the required Uniform Water Well Completion Report (GW2). Obtain a final compliance inspection from the health department and a Record of Inspection and assure that the well is tested and complies with the water quality requirements of the Regulations. F) Appropriately abandon existing private drinking water supply/well.. Abandon the well as specified by the Regulations and by the Rappahannock-Rapidan Health Department [name of permit title, e.g. Well Construction and Abandonment Permit] 047-22-087. This would include: disinfecting the existing well and assessing the well depth, materials, and depth to water. Salvage any materials that can be removed from the well. Additional requirements and conditions may be found on the abandonment permit. Submit the required Uniform Water Well Completion Report GW-5 Well Abandonment Form with all required information filled out. G) Follow all regulations and permitting pertaining to erosion and sediment control including stabilizing, seeding and grading the site after construction to return to the original state. Control construction runoff with proper practices so as not to become a nuisance to the owner or to neighboring properties or cause sediment to be discharged into state waters and drainage ditches. Any construction debris must also be removed from the site and disposed of properly. H) Bidders shall comply with all requirements of the Department of Professional and Occupational Regulations (DPOR) for contracting and executing the contract with the Virginia Department of Health. Operate within the requirements of the DPOR Water Well System Provider Certification and proof of insurance. Bidders contacted by VDH to provide any missing required documents, must provide the document within 24 business hours or their bid will be considered non-responsive. I) Submit invoice to VDH_SWAP_Grant@vdh.virginia.gov once Local Water Authority has inspected and provided a completion report and inspection and the Local Health Department has issued the Record of Inspection (ROI) along with a copy of the ROI, GW-2, GW-05, lab results and completion statement. Vendor must provide UEI number or proof of registration from sam.gov. Optional site visit: If a site visit is needed please contact Angelica Cipara to arrange a day/time for a site visit. Additional questions: Contact Angelica Cipara via email: angelica.cipara@vdh.virginia.gov Notice to Proceed If Bidder is selected for award, the Bidder shall be required to provide a signed Notice to proceed form within 3 business days of notification. VDH will provide a form for signature. Notice to Proceed If Bidder is selected for award, the Bidder shall be required to provide a signed Notice to proceed form within 3 business days of notification. VDH will provide a form for signature.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents