Similar Projects
Last Updated | 05/03/2022 01:37 PM |
Project Title | Remove and Install Air Handling Units at Sheriff`s Office |
Physical Address | View project details and contacts |
City, State (County) | Colorado Springs, CO 80903 (El Paso County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bids from qualified, experienced contractors to remove and install seven (7) air handling units and associated duct work, piping and electrical for the El Paso County Sheriff’s Office located at 27 E. Vermijo Ave. Colorado Springs, CO 80903. Contractor shall provide all material, labor, and any professional services required in accordance with the drawings provided by 51EC Inc., for the following air handler removal and installation project. 1. El Paso County shall supply Air Handling Units #1, 3, 6, 7, 8, 9, 10. 2. The Contractor shall remove ductwork, electrical, chilled water, steam piping and other items required to complete the project as specified in drawings provided by 51EC Inc. 3. Down time of the AHUs will be scheduled so only one half (1/2) of the building is down at one time. Contractor shall work with the El Paso County Project Manager to schedule the draining of chilled water and steam piping prior to performing the work. 4. The Contractor is responsible for all crane, rigging, and/or lifts needed to remove exterior pre-cast louvers and reinstall weather tight. 5. Contractors shall submit with their bids a detailed written plan of how louvers shall be rigged, removed, stored, along with how AHUs will be removed and installed. 6. El Paso County will be responsible for the removal and installation of DDC Controls, duct detectors and fire alarm. 7. Equipment supplied shall match provided 51EC Inc. drawing schedule. 8. The contractor shall perform for demolition per 51EC Inc. project drawings. 9. The Contractor shall perform hole cutting and patching, and fireproofing. 10. The building shall remain in operation. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |