Sewage Treatment Plant, Site Development Construction Project Lead, Decatur, IL 62523 (Macon County)
Last Updated | 04/28/2023 11:33 PM |
Project Title | Fermentation Reactor Pilot Project |
Physical Address | View project details and contacts |
City, State (County) | Decatur, IL 62523 (Macon County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $225,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site Directions:501 Dipper Lane Decatur IL 62522 The construction of a pilot fermenter system which will include installation of a new primary sludge pump in the existing Primary Clarifier Control Structure (Structure 210) and associated piping; piping modifications downstream of existing waste activated sludge (WAS) pump in the WAS Pump Station (Structure 112); a new compressed air mixing system; a steel frac tank that has been fabricated as a fermenter (Temporary Structure 100) and requires connections to primary sludge, WAS, compressed air mixing system, odorous air treatment system, and Primary Effluent Channel (Structure 022). The new primary sludge pump, frac tank, compressed air mixing system and one adjustable speed drive will be procured by Owner and assigned to the Contractor. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |