Similar Projects
Thomas Metcalf School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$74,459,972 CJ est. value
Normal, IL 61790

University High School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$82,297,800 CJ est. value
Normal, IL 61761

Fairview Senior Apartments
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Normal, IL 61761

Fairview Senior Apartments
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Normal, IL 61761

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

2023 Beech St Pavement Replacement
Infrastructure
Bidding
$550,360 CJ est. value
Normal, IL 61761

2022 Ground Maintenance of Public Park
Alteration
Post-Bid
Colfax, IL

Street Maintenance - Heat Scarification, Sealcoating and Fog coating
Infrastructure
Post-Bid
Hudson, IL

Olympia School Road HMA Overlay
Infrastructure
Results
$1,624,403 est. value
Bloomington, IL

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

Heartland Community College - Agriculture Complex
New Construction, Infrastructure - 30,322 SF
Construction
$16,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

QuikTrip / Bloomington
New Construction, Infrastructure - 8,000 SF
Design
$4,000,000 CJ est. value
Bloomington, IL 61705

Karr Street Reconstruction
Infrastructure
Bidding
$1,834,395 CJ est. value
Heyworth, IL 61745

Last Updated 02/14/2023 06:06 AM
Project Title

FY 2023 General Resurfacing Phase 2

Physical Address View project details and contacts
City, State (County) Bloomington, IL 61701   (McLean County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,563,708 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This work consists primarily of the removal of existing pavement surfaces and the placement of asphalt overlay at various locations as shown on the plans. The work shall include all labor, materials, tools, and equipment necessary for the proper execution and completion of the work as shown in the plans and as specified. It shall also include all work not specifically mentioned but which is reasonably and properly inferable and necessary for the completion of the work. Maps provided are to be used as a guide. Work to be performed on the City Streets will be marked with white or pink paint by a representative from the City. The paint marks and/or directives given by the Engineer will supersede information provided on maps contained in this contract. Pavement marking plans will be provided by the City as the project progresses. DEADLINE FOR QUESTIONS: January 4, 2023 A pre-bid meeting/site visit will not be held for this solicitation. It is highly suggested that interested parties understand the requirements of the solicitation before submitting a response. The City of Bloomington reserves the right to reject any and all bids and to waive technicalities. The City of Bloomington requires all Bidders /Consultants doing business with the City not to discriminate on the basis of race, age, color, religion, gender, ancestry, national origin, marital status, mental or physical disability unrelated to ability, familial status or sexual orientation. This project is being supported, in whole or in part, by federal award number SLFRP0597 awarded to City of Bloomington by the U.S. Department of the Treasury. Bid must be accompanied by a Bid guaranty which shall not be less than ten percent (10%) of the amount of the Bid. Bid guaranty may be a cashier's check, money order, certified bank check, or a surety bond. All guaranties, except surety bonds, will be deposited and reimbursement checks and surety bonds will be issued to unsuccessful bidders following the bid award. The successful bidder will be required to provide Performance and Payment Bonds in the amount equal to 100% of the contract price, within ten (10) business days after the bid award. Contractors shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Prevailing Wage Act (820 ILCS 130/1-12) including Public Act 100-1177 effective June 1, 2019. Bids may not be withdrawn for a period of 90 days after the bid opening date.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents