Similar Projects
Chippewa Valley Schools: BP2A - Algonquin and Cheyenne Office Renovations
Renovation
Post-Bid
Clinton Township, MI

Toilet Room Renovations
Renovation
Post-Bid
Sterling Heights, MI

Bid Pack 5 New Romeo Middle School
Results
Romeo, MI

Bond Issue 2016 Bid Package 13 Summer 2020
Results
Warren, MI

Academy of Warren Professional Construction Manager
New Construction, Renovation
Construction
$6,500,000 est. value
Warren, MI 48089

Romeo Middle School Technology Renovations
Renovation
Post-Bid
Romeo, MI 48065

2019 Bond Projects - Renovation at All District Buildings
Renovation
Results
New Haven, MI

Secured Entry Phase 4
Post-Bid
Sterling Heights, MI

Radio Studio Upgrades
Renovation
Results
Warren, MI

Middle and Elementary Schools, Admin Building Renovation
Renovation
Post-Bid
Roseville, MI 48066

Disaster Recovery Services
Results

Warren Consolidated Schools 2016 Bond Issue - Summer 2020
Post-Bid
Warren, MI

Roseville high school – Welding Classroom Improvements Project
Results
Roseville, MI 48066

Roseville High School Renovations
Renovation
Post-Bid
Roseville, MI 48066

2018 Bond Program-Bid Package 20-1(A-D)
Results
Warren, MI

Last Updated 12/11/2019 02:31 PM
Project Title

Henry Ford System - School Based Health Center

Physical Address View project details and contacts
City, State (County) Mount Clemens, MI 48043   (Macomb County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Interior renovations to the existing Mount Clemens High School to create a new Health Center. The project includes but is not limited to selective demolition, vinyl composite tile flooring, painting, acoustical ceilings, millwork, doors & hardware, gypsum board walls, as well as minor changes to mechanical heating & air conditioning systems, plumbing and electrical modifications.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents