Similar Projects
Webster's Cove Marina Improvements
Infrastructure
Conception
$150,000 est. value
MD

Somers Cove Marina Bulkhead Replacement Phase 3
Infrastructure
Design
$3,000,000 est. value
Crisfield, MD

Removal of Derelict or Abandoned Boats in Choptank Marina
Post-Bid
Denton, MD

Deck Replacement Deep Creek Lake State Park
Alteration
Post-Bid
Less than $50,000 est. value
Swanton, MD 21561

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Beverly Triton Nature Park
New Construction
Construction
$3,000,000 est. value
Edgewater, MD 21037

Boat Ramp Installation Services
Infrastructure
Post-Bid
Queenstown, MD

Elliott Island Marina - Jetty Construction
Results
Vienna, MD 21869

Pier Repair Services for the Town of Queenstown at 1st and 2nd Avenues
Infrastructure
Post-Bid
Queenstown, MD

Marina Bulkhead Repair
Infrastructure
Results
Less than $30,000 est. value
Federalsburg, MD 21632

Cedar Hill Marina Bulkhead and Piers Replacement
Results
Salisbury, MD 21801

Timber Boardwalk Renovation
Results
Centreville, MD 21617

Cambria Boardwalk Installation
Results
Ocean City, MD 21842

Removal and Replacement Existing Mill Flume
Results
Westminster, MD 21158

Reported 04/12/2022 10:41 AM
Project Title

Agency Wide Substructure Repairs

Physical Address View project details and contacts
City, State (County) Baltimore, MD   (Baltimore County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status No Responses Submitted, Project to Rebid
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Including, but not limited to the following: Concrete crane beam encasement repairs; concrete pile encasement repairs; construction of integral cathodic protection system for concrete piles; steel sheet pile bulkhead repairs, timber pile repairs; timber cap repairs; installation of sacrificial cathodic protection systems; steel H-pile encasement repairs; collection of timber pile samples for laboratory testing; collection of concrete core samples for laboratory testing; upgrades to existing recessed bollard installations; steel pipe pile installation; fender replacement and repairs; ladder replacement and repairs; riprap shoreline stabilization repairs; and all related work at all marine terminals and Administration facilities.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents