Similar Projects
Hazen High School Pool Modernization
Alteration
Bidding
$9,100,000 est. value
Renton, WA

Kelso High School Stadium Mechanical Improvements
Alteration
Bidding
$445,000 est. value
Kelso, WA 98626

Urgent Residential Water Heater Replacement
Alteration
Post-Bid
Tacoma, WA

Mechanical Construction Work Order
Alteration
Post-Bid
Seattle, WA

Mechanical and Plumbing On Call Portwide
Alteration
Results
$300,000 est. value
Seattle, WA

South Treatment Plant Heating Systems Improvements
Alteration
Results
Seattle, WA

Building 27 Boiler and Fluid Cooler Replacement
Alteration
Bidding
$470,000 to $520,000 est. value
Olympia, WA 98512

Mechanical MATOC
Term Contract
Post-Bid
$2,000 to $500,000 est. value
WA

Boiler Expeller Shaft and Bearings
Alteration
Results
$140,000 est. value
Spokane, WA

Design - Chiller Control Panel Replacement Phase 2 - Building Engineering Systems
Alteration
Bidding
$625,000 to $815,000 est. value
Seatac, WA 98188

Kent Phoenix Boiler and Water Heater Replacement
Alteration
Post-Bid
Kent, WA 98030

Urgent Gas Furnace Replacement
Alteration
Results
$8,602 est. value
Tacoma, WA

Straightening Press
Term Contract, Alteration
Post-Bid
Bremerton, WA 98337

Chiller and Boiler Chemical Testing and Maintenance Services
Alteration
Results
Vancouver, WA

242A-Ba Boiler - Third Party Boiler Inspection
Term Contract
Post-Bid
Richland, WA

Reported 04/23/2022 12:00 AM
Project Title

Somerset Elementary School Boiler Replacement

Physical Address View project details and contacts
City, State (County) Bellevue, WA 98006   (King County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of Project is defined by the Contract Documents and consists of the following: 1. Demo existing boiler and boiler appurtenances. 2. Demo existing air separator. 3. Provide two high efficiency gas-fired boilers and appurtenances. 4. Provide air separator. 5. Provide DDC controls for boilers. 6. Provide miscellaneous improvements to the existing heating water system. 7. Electrical work to support mechanical scope.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Humidity Control Equipment, Mechanical Dehumidification Units.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents