Similar Projects
Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

Drainage Improvements on CR 11
Infrastructure
Bidding
AL

Marlow Spring Branch Restoration Project
Infrastructure
Bidding
$800 to $1,000 est. value
Summerdale, AL

Drainage Rehabilitation (Materials Only)
Post-Bid
Robertsdale, AL

Stream and Drainage Cleanout
Term Contract
Post-Bid
Foley, AL

Drainage Improvements for Oak Street and Section Street at Bid Mouth Gully
Results
Less than $233,415 est. value
Fairhope, AL 36532

Provision of Corrugated Round and Arch Bituminous Coated (Metal) Pipe
Results
AL

Construction Pipe and Culvert Procurement
Results
Foley, AL

Gulf of Mexico Artificial Reef Construction Project
Results
Gulf Shores, AL

Gulf of Mexico Artificial Reef Construction Project
Results
Gulf Shores, AL

Morphy Avenue Substation Site Work
Infrastructure
Results
$378,086 est. value
Fairhope, AL

Spanish Fort High School Baseball Drainage and Other Improvements
New Construction, Addition
Results
$94,755 est. value
Bay Minette, AL

City-Wide Drainage Maintenance FY 2021
Infrastructure
Results
$150,000 est. value
Gulf Shores, AL

Quail Creek NRHS Project
Infrastructure
Results
$399,702 est. value
Fairhope, AL

Alabama Point Seawall Repair Design
Term Contract, Infrastructure
Results
$335,250 est. value
Orange Beach, AL

Last Updated 01/05/2022 12:23 PM
Project Title

Summit Drive NRCS EWP Project

Physical Address View project details and contacts
City, State (County) Fairhope, AL   (Baldwin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value $760,602
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of: Approximately 7,900 square feet of proposed welded wire basket face retaining wall, including all reinforcement geogrid, select backfill for the wall sections and 80 tons of class II rip-rap for toe protection for the wall. The slope above the wall will be graded to tie into the existing slope above the wall. Additionally, there will be approximately 100 LF of 18” RCP storm drain, 2 weir top reinforced concrete inlets, 2,000 square yards of solid sod, 340 LF of 6ft high vinyl coated chain link fence, erosion control and construction entrance.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Retaining Walls, Cast-in-Place Concrete Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents