Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Pole Mount, Pad Mount and Three Phase Pad Mount Transformers
Term Contract
Sub-Bidding
Tillamook, OR 97141

Arlene Schnitzer Concert Hall Backup Generator Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Portland, OR 97205

Franklin K-8 Renovation
Alteration
Post-Bid
Corvallis, OR

Hills Creek Dam Electrical Reliability Upgrades
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Oakridge, OR 97463

Senior Center Solar Panel Project
Alteration
Results
$132,800 est. value
Redmond, OR 97756

Gateway and Franklin Emx LED Lighting Upgrade
Alteration
Results
Eugene, OR

Contractor - Bonneville Powerhouse 1 Main Unit Breaker Replacement
Alteration
Design
$700,000 est. value
Cascade Locks, OR

Electrical Services
Term Contract
Sub-Bidding
Cannon Beach, OR 97110

John Day Dam Turbine Runner Replacement and Generator Rewind Project - 90% Review
Renovation, Term Contract
Post-Bid
$500,000,000 est. value
Rufus, OR 97050

Water Treatment Plant Standby Generator
Alteration
Results
Roseburg, Winchester, OR 97495

Low Voltage Cabling Services
Renovation
Sub-Bidding
$60,000 CJ est. value
Forest Grove, OR 97116

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

Two 1500 or 2000 KVA 3 Phase Substation Regulators
Alteration
Results
Eugene, OR

Last Updated 09/27/2022 09:22 AM
Project Title

Southwest 257th Drive Street Lighting Replacement

Physical Address View project details and contacts
City, State (County) Troutdale, OR 97060   (Multnomah County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Suppliers who do not currently have access to the Multco Marketplace Supplier Portal will need to complete the "MMP Supplier Access Request Form". The optimal time to submit the "MMP Supplier Access Request Form" to gain access to participate in a formal Sourcing Event (RFP, RFPQ or ITB) is 14 days. This will allow the County sufficient time to review your request and for you, the supplier, to access the Sourcing Event and to perform the actions needed before the event close date. All questions or requests for clarification must be submitted through the Q&A Board of this Sourcing Event by 4:00 p.m., April 15, 2022. Bid Bond of not less than ten (10) percent of the total amount of the bid must be submitted with all proposals. Performance and Payment bonds will be required from the successful proposer before contract execution. Proposers must meet the following minimum requirements. Failure to provide any of the required documents or meet any of the below requirements shall result in rejection of the proposal. The estimate is in the $300,000.00 to $400,000.00 range.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents