Similar Projects
Last Updated | 02/14/2023 09:02 AM |
Project Title | 2023 Wastewater System Improvements |
Physical Address | View project details and contacts |
City, State (County) | Roy, MT 59471 (Fergus County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,141,828 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | There will be no Pre-bid conference. The project consists of three schedules. Schedule One, the lift station rehabilitation, will consist of demolishing the existing lift station, replacing the lift station pumps, piping, valves, installing a new generator, upgrading the existing controls with level transmitters as the primary controls and floats as secondary controls, and upgrading the electrical. Schedule Two, the center pivot rehabilitation, will consist of installing a new 273 foot center pivot and installing a separate, dedicated electrical service for the center pivot. Schedule Three, the lagoon maintenance, will consist of replacing two, 6-inch influent valves, repairing liner holes, fixing bank sloughing, and installing an emergency bypass main. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |