Similar Projects
O'Reilly Auto Parts (GHT)
New Construction - 6,800 SF
Conception
$500,000 to $900,000 est. value
Glenn Heights, TX

AutoZone #5791
New Construction - 6,000 SF
Conception
$500,000 to $1,000,000 est. value
Humble, TX 77346

Walmart Supercenter #4627-278 - D8 Pet Cooler
Renovation - 188,180 SF
Design
Denton, TX 76201

Walmart Supercenter #3286-276 - D8 Pet Cooler
Renovation - 204,167 SF
Design
Hickory Creek, TX

Petsmart #3273 -Eastlake Marketplace / El Paso
Renovation - 461 SF
Sub-Bidding
$120,000 est. value
Horizon City, TX 79928

Hanson's Corner - Multi-Tenant Shell Building
New Construction - 4,650 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Hutto, TX 78634

Walmart Supercenter #789-609 - CAPXREF-2
Renovation
Post-Bid
Mesquite, TX 75149

O'Reilly Auto Parts #6152 (DLV)
New Construction - 8,342 SF
Construction
$500,000 to $900,000 est. value
Del Valle, TX 78617

Academy Sports
New Construction - 70,180 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Mesquite, TX 75150

Kohl's Sephora
Renovation - 2,500 SF
Design
Flower Mound, TX

Visionworks
Renovation - 4,192 SF
Post-Bid
$230,000 est. value
Houston, TX 77024

Verizon Wireless
Renovation - 2,578 SF
Construction
Grand Prairie, TX 75052

Ross Dress For Less #2445
Renovation - 22,839 SF
Design
El Paso, TX 79907

Walmart Supercenter #3763-239 - CSP
Renovation - 25,515 SF
Post-Bid
$200,000 est. value
El Paso, TX 79938

Mattison Avenue Salon Suites & Spa
Build-Out - 10,700 SF
Construction
$700,000 est. value
Highland Village, TX 75077

Reported 07/14/2022 11:40 AM
Project Title

Smokeshop Addition

Physical Address View project details and contacts
City, State (County) Baytown, TX 77521   (Chambers County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Competitive Bids.
Project Status Construction Documents, Construction Start Expected February 2023, Construction Completion Expected August 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 13 2022, this project is in the permitting stage as per source. Information regarding a general contractor has not been disclosed. A firm construction timeline has yet to be established, however construction will take about six months to complete*.

Details

Retail, Addition.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents